BLDG 722 Electrical Installation - April 2026

SOL #: W911RX26QA024Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT RILEY
FORT RILEY, KS, 66442-0248, United States

Place of Performance

Fort Riley, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 24, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Apr 6, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, MICC-FT RILEY, is soliciting proposals for a Firm Fixed Price Service Contract for Electrical Installation and Upgrades in Building 722 at Fort Riley, Kansas. This Total Small Business Set-Aside opportunity aims to upgrade electrical infrastructure to support the Synthetic Training Environment-Reconfigurable Virtual Collective Trainer-Air (STE-RVCT-A) suite. Offers are due by April 6, 2026.

Scope of Work

The project involves a one-time electrical upgrade within Building 722. Key tasks include:

  • Installation of one (1) 300 Amp Electrical Panel, replacing an older panel. Powering this panel from an existing North wall panel is the contractor's responsibility.
  • Installation of thirteen (13) dedicated 20 Amp electrical outlets, to be mounted on pre-existing grid railing at 14 feet high.
  • Provision and installation of thirteen (13) 25-foot cord reels, one for each outlet, suitable for 20 Amp loads (SO cord acceptable).
  • Provision and installation of approximately 150 feet of conduit and 150 feet of electrical wiring.
  • All electrical work must comply with NFPA 70E, NEC 70, NEC 70B, and applicable Army Regulations. The power requirement is 60 hertz single phase, with raceway running through suspended drop ceilings (14ft high).

Contract Details & Timeline

  • Contract Type: Firm Fixed Price Service Contract.
  • Period of Performance: 7 business days for the upgrade, within the overall period of April 10, 2026, to April 30, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19.8 million.
  • Offer Due Date: April 6, 2026, at 09:00 PM ET.
  • Site Visit: A non-mandatory site visit is scheduled for March 31, 2026, at 0900 hrs at Building 722, Fort Riley, KS. A maximum of two representatives per Offeror are permitted, and no pictures are allowed.

Submission & Evaluation

Offerors must complete and sign the 'Solicitation - W911RX26QA024' and 'Attachment 01 Salient Characteristics Sheet', submitting them via email to the Point of Contact. Proposals will be evaluated based on Minimum Technical Acceptability and Price. Special Requirements include providing proof of specific insurance coverage, local background checks for personnel, AT Level I and iWATCH training, IAT Level I certification, and developing a Quality Control Program (QCP). Contractors must also use E-Verify and comply with the Service Contract Act Wage Determination for Geary County, Kansas.

Key Documents

Relevant documents include 'BLDG 722 Drawings', 'Elec Install Site Pictures', and 'Contractor Questions and Answers W911RX26QA024 March 26 2026', which provide visual context, technical clarifications, and floor plans essential for proposal preparation.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Mar 30, 2026
View
Version 5
Solicitation
Posted: Mar 30, 2026
View
Version 4Viewing
Solicitation
Posted: Mar 27, 2026
Version 3
Solicitation
Posted: Mar 26, 2026
View
Version 2
Solicitation
Posted: Mar 25, 2026
View
Version 1
Solicitation
Posted: Mar 24, 2026
View