BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS

SOL #: W519TC26RA021Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

IL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 24, 2026
2
Last Updated
Mar 27, 2026
3
Submission Deadline
Apr 10, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for the Sky Foundry B299 Electrical Relocation project at Rock Island Arsenal, IL. This project involves the relocation of existing bus ducts, conduits, and communication cables within Building 299, Zone 8. The government intends to award a single Firm Fixed Price (FFP) contract with an estimated magnitude between $250,000 and $500,000. Offers are due by April 10, 2026, at 10:00 AM local time.

Scope of Work

The project requires the contractor to provide all necessary materials and labor for the complete relocation and installation of existing electrical infrastructure. Key tasks include:

  • Bus Duct Relocations: Relocating three specific bus ducts (1200-amp Square D, 800-amp Siemens Spectra series) within Building 299, Zone 8, including extensions and adding bus plugs.
  • Conduit and Cable Relocations: Moving various conduits and communication lines to new positions, typically above heaters and closer to roof trusses. This involves specific rerouting near columns, feeding panels, and removing protruding electrical components.
  • General Requirements: Verifying wiring and power availability, adhering to national electrical codes, and ensuring all furnished equipment is new and unused.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Period of Performance: 150 calendar days from notice to proceed.
  • Estimated Magnitude: $250,000.00 - $500,000.00
  • Set-Aside: None specified (standard FAR clauses regarding small business concerns are included).
  • Offers Due: April 10, 2026, at 10:00 AM local time.
  • Published Date: March 27, 2026.

Evaluation

Proposals will be evaluated based on the lowest price, responsiveness, and responsibility. Cost data is not required with the initial proposal, but the government reserves the right to request it.

Special Requirements & Notes

  • Site Visit: A mandatory pre-construction site visit is scheduled for April 2, 2026, at 11:00 AM Central Time. Reservations are required by contacting JOHN.E.JACOBSEN16.CIV@ARMY.MIL.
  • Security: Contractors must comply with all Rock Island Arsenal (RIA) security requirements, including background checks, personal identity verification, and Anti-Terrorism Level I and iWatch training. No Common Access Card (CAC) will be issued. A Real ID form of identification will be required for entry starting May 3, 2025.
  • Quality Assurance: Performance will be monitored via a Quality Assurance Surveillance Plan (QASP), focusing on 100% adherence to electrical codes and safety regulations.
  • Bonds: Performance and Payment Bonds are required.
  • Contact: JOHN JACOBSEN (JOHN.E.JACOBSEN16.CIV@ARMY.MIL).

People

Points of Contact

JOHN JACOBSENPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Mar 27, 2026
Version 2
Solicitation
Posted: Mar 25, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 24, 2026
View
BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS | GovScope