Building 350 Clean and Paint Requirement

SOL #: FA855626QBXXXCombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8556 AFLCMC EBGK COM
ROBINS AFB, GA, 31098-1811, United States

Place of Performance

Warner Robins, GA

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
May 14, 2026
3
Submission Deadline
May 20, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is seeking proposals for Building 350 Clean and Paint Requirement at Robins AFB, GA. This Total Small Business Set-Aside opportunity involves facility renovation services to convert an old warehouse area into a functional breakroom. Quotes are due by May 20, 2026.

Scope of Work

This requirement focuses on renovating Room A127, Bay A, Building 350, to create a safe and sanitary breakroom. Key tasks include:

  • Removal of old security hardware, electrical wiring, and conduit.
  • Removal of extruding metal hardware.
  • Repair and refinishing of all wall, door, and ceiling surfaces.
  • Thorough cleaning of wall surfaces and concrete deck ceiling.
  • Disposal of removed devices and hardware.
  • Painting of all wall and ceiling areas, including doors and frames, using specified Sherwin Williams primer and topcoat.
  • Painting of gas lines with POL color coding and fire electrical conduits red, per Robins AFB Facility Standards.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Period of Performance: 30 calendar days following contract award.
  • Quotes Due: May 20, 2026, by 7:00 PM UTC (3:00 PM EST).
  • Published: May 8, 2026.
  • Place of Performance: Legacy Air Dominance Program Office, Building 350, Bay A, 425 Eastman Street, Robins AFB, GA, 31098-1811.

Site Visit Information

A site visit is scheduled for Tuesday, May 12, 2026, from 10:00 AM to 11:00 AM EST at 425 Eastman Street Building 350 RAFB, GA 31098. Attendees must RSVP by emailing Henry Harris (henry.harris.4@us.af.mil) no later than 12:00 PM EST on Monday, May 11, 2026. No questions will be answered during the visit; all questions must be submitted via email prior to the visit. Building 350 is a secure facility, prohibiting cell phones, cameras, and Bluetooth devices inside.

Attachments

  • Attachment 1 - AMRAAM Breakroom Clean and Paint Area Dimensions: Provides architectural drawings detailing dimensions and areas for cleaning and painting, crucial for estimating labor and materials.
  • Attachment 2 - AMRAAM Breakroom Renovation Project, Demolition: Outlines specific demolition tasks, including removal of electrical boxes, switches, conduit runs, and security cameras.

Special Requirements

Contractor personnel will be escorted by Government personnel and must coordinate with facility security for access. Facility access is available from 07:30 AM to 5:00 PM, Monday-Friday (excluding Federal Holidays). Compliance with installation security requirements, base access procedures, and Government Safety and Health regulations (OSHA, ESOH) is mandatory. No Government property will be provided, and no security clearance is expected for contractor personnel.

Submission Instructions

All quotes must be submitted to Henry Harris at henry.harris.4@us.af.mil.

People

Points of Contact

Henry HarrisPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 8, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View