Building M457 & M458 Paint and Flooring Repairs

SOL #: N40085-26-R-9040Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
May 28, 2026
3
Submission Deadline
May 29, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Building M457 & M458 Paint and Flooring Repairs at Camp Lejeune, NC. This is a Combined Synopsis/Solicitation under a Total Small Business Set-Aside (FAR 19.5), restricted to M&R Contractors listed on the General Requirements cover page. The project involves comprehensive interior and exterior painting, along with the replacement of flooring systems in both buildings. Proposals are due May 29, 2026, at 2:00 PM EST.

Scope of Work

This project, identified as Project No. 25-0411, focuses on Buildings M457 and M458 at Camp Johnson, MCB Camp Lejeune. Both buildings are identical.

  • Painting: Includes preparation and painting of all interior and exterior surfaces (walls, doors, frames, windows, lintels), repair of cracks/holes, mold/mildew treatment, and replacement of damaged trim/caulking. Specific paint types and finishes are required, with electrical panel covers to be spray painted. Lead paint is present in M458, requiring a hazardous materials plan for scraping and encapsulation (not abatement). Sprinkler pipes are not included in the paint scope.
  • Flooring: Involves the removal of existing flooring in all sleeping rooms, shared/common spaces, and lounges. New Luxury Vinyl Tile (LVT) will be installed in sleeping rooms, while Epoxy Resinous Flooring will be installed in shared/common spaces, lounges, stair treads, and stairwells. All existing flooring systems in shared/common spaces and lounges are to be removed. All flooring surfaces must be free of previous adhesives, and LVT flooring sealed. Existing transition strips and rubber cove base will be removed and replaced.
  • General: The contractor is responsible for field-verifying all measurements, moving furniture, and coordinating work in occupied buildings (approximately 50% of work areas available at a time).

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (implied construction contract).
  • Period of Performance: 540 days after award.
  • Estimated Cost Range: Between $1,000,000 and $5,000,000.
  • Liquidated Damages: $880 per Calendar Day.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Eligibility: Restricted to M&R Contractors listed on the General Requirements cover page.

Submission & Evaluation

  • Proposal Due Date: May 29, 2026, 2:00 PM EST.
  • Submission Method: Via email to NAVFAC_ML_ROICCCampLejeune-Bids1@navy.mil AND benjamin.a.bryan.civ@us.navy.mil.
  • Basis for Award: Lowest Price.
  • Site Visit: Scheduled for Tuesday, May 5, 2026, at 9:00 AM, meeting at Bldg M457.
  • Requests for Information (RFIs) Cut-off: May 21, 2026, by 3:00 PM EST. Submit RFIs to benjamin.a.bryan.civ@us.navy.mil.
  • Bonds: Bid bonds are required based on proposal value: none for <$40K, payment bond only for >=$40K, and bid bond, payment bond, and performance bond for >=$150K.
  • Amendment Acknowledgment: Bidders must acknowledge receipt of Amendment 0001 and 0002 with their proposal.

Special Requirements & Notes

  • Occupied Buildings: Work must be scheduled to minimize interference with ongoing facility operations.
  • Hazardous Materials: A hazardous materials plan for lead work is required for M458. The Contractor Environmental Guide for MCB Camp Lejeune provides comprehensive guidance on environmental compliance.
  • Submittals: A Submittal Register outlines required documentation, including manufacturer's product specifications, technical data, and environmental plans.
  • Materials: Product specifications detail specific manufacturers (e.g., Benjamin Moore, Sherwin Williams, Mannington, Dur-a-Flex) and models for paints, LVT, and Epoxy Resinous Flooring. Substitutions are not permitted due to lead times.
  • Funding: Funding availability is not guaranteed; no award will be made if funds are not available.
  • Compliance: Executive Order 13706 (Paid Sick Leave for Federal Contractors) and Buy American Requirement-Construction Materials provision apply.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: May 28, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 14, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Building M457 & M458 Paint and Flooring Repairs | GovScope