CGC Margaret Norvell – FM200 Hoses and Annual inspection/ Gaylord Hood Clean and Inspect

SOL #: 52000QR260023277Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 1(00080)
NORFOLK, VA, 23510, United States

Place of Performance

Miami Beach, FL

NAICS

Ship Building and Repairing (336611)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 24, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Mar 30, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard Surface Force Logistics Center is soliciting quotes for FM200 Hoses and Annual Inspection of fire suppression systems, and Gaylord Hood Cleaning and Inspection on the CGC Margaret Norvell in Miami, FL. This is a Total Small Business Set-Aside opportunity. Quotes are due March 30, 2026.

Scope of Work

This requirement involves two primary maintenance tasks:

  • FM-200 Fire Suppression System: Annual inspection and testing of the FM-200 systems in the Engine Room, Generator Room, and Emergency Generator Room. This includes solenoid valve removal, fire panel verification, ventilation system checks, pressure switch simulation, compressed gas cylinder weight/pressure checks, and replenishment of all three primary and secondary systems to required cylinder weight. A certified Tech Rep from Chemetron Fire Systems is required.
  • Gaylord Hood Ventilation System: Cleaning and inspection of the interior of the Galley's Gaylord Hood supply and exhaust ventilation system. This also includes recertification of the associated fixed fire extinguishing system per manufacturer requirements and TP 8057. Photographic documentation of ducting interiors (before and after cleaning) is required.

All work will include post-repair operational testing in the presence of a Coast Guard Inspector and submission of a Contractor Furnished Report (CFR) for discrepancies.

Contract Details

  • Contract Type: Firm-Fixed Price (FFP) using Simplified Acquisition Procedures (FAR Part 13.5).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 336611 (Ship and Boat Building) with a 1300 employee size standard.
  • PSC: J020 (Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment).
  • Period of Performance: April 8th – 9th, 2026.
  • Place of Performance: CGC Margaret Norvell, 100 MacArthur Causeway, Miami, FL 33139.

Submission Requirements

Interested vendors must submit quotes on company letterhead, including:

  • Detailed cost breakdown (Unit Cost, Extended Price, Total Price).
  • Payment terms and any prompt payment discounts.
  • Company Unique Entity ID (UEI) and CAGE Code.
  • Product/service details, Product Data Sheet, and warranty information.
  • Vendors MUST be registered in www.sam.gov.

Evaluation Criteria

Award will be made to the responsible contractor whose quote conforms to the solicitation and is most advantageous to the Government, considering specification, price, past performance, and quality. The Government reserves the right to award on an "All or None Basis."

Key Dates & Contacts

Important Notes

Numerous FAR clauses apply, including those related to representations and certifications, which must be completed electronically via SAM.gov prior to quote submission.

People

Points of Contact

Cornelius ClaibornePRIMARY

Files

Files

Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
CGC Margaret Norvell – FM200 Hoses and Annual inspection/ Gaylord Hood Clean and Inspect | GovScope