CGC Margaret Norvell – FM200 Hoses and Annual inspection/ Gaylord Hood Clean and Inspect

SOL #: 52000QR260023277Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 1(00080)
NORFOLK, VA, 23510, United States

Place of Performance

Miami Beach, FL

NAICS

Ship Building and Repairing (336611)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 24, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Apr 13, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Coast Guard (USCG) Surface Force Logistics Center is soliciting quotes for FM200 Hoses and Annual Inspection and Gaylord Hood Clean and Inspect services for the CGC Margaret Norvell in Miami, FL. This is a Total Small Business Set-Aside opportunity.

Scope of Work

The contractor shall provide comprehensive maintenance services, including:

  • FM-200 Fixed Fire Suppression System: Annual inspection and testing of the FM-200 systems in the Engine Room, Generator Room, and Emergency Generator Room. This includes solenoid valve removal, fire panel verification, ventilation system checks, FM-200 release station operation, pre-discharge timing, siren/bell/strobe activation, ventilation system shutdown, MCMS shutdown indication, alarm panel/HMI/MCMS activation, pressure switch simulation, and CFR submission for discrepancies. Inspection and testing of compressed gas cylinders for compliance with CFR Title 49, Section 173.34, including weight and pressure checks, and replenishment of all three primary and secondary systems to required cylinder weight. A certified Tech Rep from Chemetron Fire Systems is required.
  • Gaylord Hood Ventilation System: Cleaning and inspection of the interior of the Galley's Gaylord Hood supply and exhaust ventilation system. This involves initial operational testing, photographic documentation before and after cleaning, cleaning approximately 15 linear feet of ducting per SFLC Std Spec 5100, and recertifying the fixed fire extinguishing system per manufacturer requirements and TP 8057.
  • General Requirements: Furnish and install protective coverings, coordinate all test procedures and safety precautions with the COR, and conduct post-repair operational tests in the presence of a Coast Guard Inspector.

Contract Details

  • Contract Type: Firm-Fixed Price Purchase Order, using Simplified Acquisition Procedures (FAR Part 13).
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 336611 (Ship Building and Repairing) with a 1300 employee size standard.
  • Period of Performance: April 29th – 30th, 2026.
  • Place of Performance: CGC Margaret Norvell, 100 MacArthur Causeway, Miami, FL 33139.

Submission & Evaluation

Award will be made to the responsible contractor whose quote conforms to the solicitation and offers the best value to the Government, considering price and other factors. Evaluation criteria include specification, price, past performance, and quality. Offerors must provide warranty information. Quotes must be submitted on company letterhead and include:

  • Cost Breakdown, Unit Cost, Extended Price, Total Price.
  • Payment Terms, Discount offered for prompt payment.
  • Company Unique Entity ID (UEI) and CAGE Code.
  • Product/service details and Product Data Sheet IAW SOW for technical review. Vendors must be registered in SAM.gov. The Government reserves the right to award on an "All or None" basis.

Key Dates & Contacts

People

Points of Contact

Cornelius ClaibornePRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
CGC Margaret Norvell – FM200 Hoses and Annual inspection/ Gaylord Hood Clean and Inspect | GovScope