DCSC-26-RFP-068 BLD A Cooling Upgrades

SOL #: DCSC-26-RFP-068Special Notice

Overview

Buyer

District Of Columbia Courts

Place of Performance

Washington, DC

NAICS

Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing (333415)

PSC

Air Conditioning Equipment (4120)

Set Aside

No set aside specified

Timeline

1
Posted
May 5, 2026
2
Last Updated
Jun 1, 2026
3
Action Date
Jun 2, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The District of Columbia Courts (DCC), Procurement and Contracts Branch, is soliciting proposals for BLDA Cooling System Upgrades at the DC Superior Courts Probate Division, Building A (BLDA), located at 515 5th St NW, Washington, DC 20001. This is a Firm Fixed-Price contract for construction services. Proposals are due Tuesday, June 02, 2026, by 3:00 PM EST. Amendment No. 01 rescheduled Site Visit #02 to Wednesday, May 18, 2026, at 10:00 AM EST.

Scope of Work

The project involves comprehensive upgrades to the condenser water and chilled water systems in the basement and penthouse of Building A. Key tasks include:

  • Installation of Condenser Pump(s), Chilled Water Pump(s), Heat Exchanger(s), VFDs, and associated Piping and Controls.
  • Demolition and removal of existing equipment.
  • Survey and abatement of hazardous materials, with a significant allowance of $100,000.00 allocated for this in Attachment K.
  • Provision of temporary cooling systems if required.
  • Submission of a complete project schedule and coordination with commissioning agents, Construction Manager, and Quality Assurance.
  • Maintaining a clean work site throughout the project. Bidders must utilize "Attachment K - Offer_Breakdown_BLDA_Cooling_System_Upgrades.xlsx" to structure their pricing proposals, detailing costs by CSI Divisions.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Period of Performance: 300 calendar days from the Notice to Proceed (NTP), anticipated July 2026 through April 2027.
  • Substantial Completion: 270 calendar days after NTP.
  • Final Completion: 300 calendar days after NTP.
  • Offer Price Guarantee: 120 days from submission date.
  • Set-Aside: None specified.
  • Proposal Due: Tuesday, June 02, 2026, at 3:00 PM EST.
  • Published: May 14, 2026 (Amendment 01).

Eligibility & Submission

  • Experience Requirements: Offerors must demonstrate at least 10 years of experience and management of projects with a minimum dollar value of $1,500,000.
  • Wage Determination: Contractor must adhere to Wage Determination No. DC20260002.
  • Submission: Proposals must be submitted in two parts: "Technical Proposal" and "Price Proposal." An original and four copies are required, plus a separate electronic copy. Sealed envelopes must be marked with the solicitation number, offeror's name/address, and due date/time.
  • Evaluation: Proposals will be evaluated based on Technical Criteria (85 points) and Price (15 points).

Key Dates & Notes

  • Site Visit #02: Wednesday, May 18, 2026, at 10:00 AM EST. Location: Main Entrance Building A, 515 5th Street, 118 Q Street, NW, Washington DC. 20002.
  • Proposal Due Date: Tuesday, June 02, 2026, at 3:00 PM EST.
  • Offerors must acknowledge receipt of Amendment No. 01 and attach a signed copy to their proposal. Failure to do so may result in proposal rejection.
  • Attachments J.1 through K.4 and Project Manual (J.23) are incorporated by reference.

People

Points of Contact

Kenneth L. Evans JrPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 5
Special Notice
Posted: Jun 1, 2026
View
Version 4
Special Notice
Posted: May 20, 2026
View
Version 3
Special Notice
Posted: May 14, 2026
View
Version 2Viewing
Special Notice
Posted: May 14, 2026
Version 1
Special Notice
Posted: May 5, 2026
View