Demolition, Remediation and Restoration

SOL #: 6913G626Q300030Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Office Of The Secretary
6913G6 VOLPE NATL. TRANS. SYS CNTR
CAMBRIDGE, MA, 02142, United States

Place of Performance

Clovis, CA

NAICS

Site Preparation Contractors (238910)

PSC

Other Environmental Services, Studies, And Analytical Support (F999)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 29, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
Jun 17, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Transportation's Volpe National Transportation Systems Center, supporting the FAA, is soliciting proposals for Demolition, Remediation, and Restoration services at the CZQ VOR facility in Clovis, CA. This Total Small Business Set-Aside opportunity aims to prepare the unused FAA site for lease cancellation by removing environmental hazards, demolishing structures, and restoring the land. Proposals are due by June 17, 2026, at 2:00 PM ET.

Scope of Work

The contractor will be responsible for comprehensive demolition, remediation, and restoration activities. This includes:

  • Environmental Hazard Removal: Addressing identified issues such as PACM, PLBP, lead in soil, and potential PCB contamination as detailed in the Site Survey Report (Attachment IV).
  • Demolition and Removal: Complete removal of all on-site structures and infrastructure, including shelters, concrete footings, fencing, power poles, electrical equipment, and underground wiring/piping.
  • Debris Disposal: Segregation and offsite disposal/recycling of demolition debris, with hazardous materials handled according to federal, state, and local laws.
  • Site Restoration: Restoring disturbed areas to their approximate original grade, requiring 95% compaction and the use of clean, uncontaminated fill.
  • Work Plan Development: Submission of a draft and final Demolition, Removal, and Restoration Work Plan within 10 business days of a kickoff meeting, incorporating a Site Safety and Health Plan (SSHP) and a Risk Management Plan.
  • Permitting: Obtaining all necessary local, state, and federal permits.
  • Closeout: Submission of a closeout report detailing work, sample results, waste manifests, and site photographs.

Contract Details & Timeline

  • Contract Type: Firm Fixed Price (FFP) purchase order. CLIN 00100 will be fully funded at award.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Period of Performance: From date of award to September 30, 2026, with on-site demolition and restoration activities to be completed by September 1, 2026.
  • Proposal Due: June 17, 2026, at 2:00 PM Eastern Time.
  • Questions Due: June 11, 2026, at 1:00 PM Eastern Time.
  • Place of Performance: CZQ VOR – Clovis, CA.

Submission & Evaluation

Proposals must be emailed to roland.regan@dot.gov, citing Solicitation Number 6913G626R200005. Offerors must include their SAM UEI on the cover page. Evaluation will prioritize: Prices (cost buildup), Schedule, Technical explanation (2-page narrative per CLIN), and Past Performance. A detailed cost buildup for CLIN 00100 is required. The award will be made to the most advantageous offeror. Compliance with the Service Contract Act Wage Determination (WD 2015-5609) for Fresno County, CA, is mandatory.

Contact Information

Roland Regan (roland.regan@dot.gov)

People

Points of Contact

Roland ReganPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 29, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 29, 2026
View
Demolition, Remediation and Restoration | GovScope