F--Gas/Oil Well Plugging at CUVA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, has issued a Solicitation for Gas/Oil Well Plugging and Abandonment Services at Cuyahoga Valley National Park (CUVA). This project involves reclaiming two orphaned oil and gas well sites that pre-date the park's establishment. This is a 100% Total Small Business Set-Aside. Bids are due by March 31, 2026, at 1:00 PM ET.
Scope of Work
The contractor will furnish all labor, equipment, materials, and transportation to replug and abandon two existing orphaned oil and gas wells. Key tasks include:
- Filing Ohio Department of Natural Resources (ODNR) work permits and obtaining landowner passthrough permits.
- Developing and submitting a plugging and reclamation plan approved by both NPS and ODNR.
- Preparing and submitting a Safety Plan post-award, detailing preventative and responsive measures for hazardous materials like H2S.
- Constructing temporary access routes, performing hot taps, and reentering/replugging wells as necessary.
- Cutting surface casing, installing surface markers, and measuring methane levels.
- Cleaning up and removing all surface equipment, debris, and flowlines within 200 feet of wellsites.
- Restoring the area to its natural contour, with reseeding as the primary revegetation requirement.
- Ensuring compliance with all applicable Ohio laws, NPS nonfederal oil and gas rights regulations (36 CFR § 9.116), and the more stringent of Ohio or BLM onshore plugging requirements.
Contract Details
- Contract Type: Firm Fixed Price
- Set-Aside: 100% Total Small Business
- NAICS Code: 213112 (Size Standard: $47 Million)
- Period of Performance: April 8, 2026, to October 9, 2026 (180 days after Notice to Proceed, which follows approximately 90 days for ODNR permit approval).
- Wage Determination: Davis-Bacon WD OH20260001, effective 01/02/2026.
Key Dates & Submission
- Bid Due Date: March 31, 2026, by 1:00 PM ET
- Submission Method: Electronically via email to Cole_Johnson@NPS.Gov
- Published Date: March 19, 2026 (latest amendment)
- Site Visit: A site visit was held on February 17, 2026. No second official site visit will be conducted, but independent visits are permitted outside restricted areas.
Evaluation
Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price and price-related factors (Lowest Price Technically Acceptable).
Important Notes & Clarifications
- Amendments: This solicitation has been amended multiple times, with Amendment 0002 incorporating a consolidated Q&A document and a revised Statement of Work (dated 3/18/2026).
- Funding: The contract is subject to the availability of appropriated funds (FAR Clause 52.232-18).
- Specific Requirements: Wiring must be copper AWG 12. Contractor is responsible for obtaining ODNR plugging permits and coordinating access with Sagamore Township for the un-named well. A 25-foot buffer zone is required for railroad tracks.
- Documentation: A Bid Guarantee (20% of bid price, not to exceed $3M) and a Limitations on Subcontracting worksheet (FAR 52.219-14) are required with the bid.