Geiger Quad G530 & G550 DOAS Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the Geiger Quad G530 & G550 DOAS Replacement project at Camp Lejeune, NC. This Total Small Business Set-Aside opportunity is restricted to specific Mechanical MACC Contractors. The project involves replacing Dedicated Outside Air System (DOAS) units and associated mechanical, electrical, and control systems. Proposals are due by June 3, 2026, at 1200.
Scope of Work
This project entails the replacement of DOAS Units at both the G530 Quad Buildings (G530, G531, G531A, G531B, G531C) and G550 Quad Buildings (G550, G551, G551A, G551B, G551C) at Camp Geiger, Marine Corps Base, Camp Lejeune, North Carolina. The scope includes incidental related work, such as the replacement of all exterior ductwork, and integration with existing Johnson Controls Metasys DDC systems. Work must comply with detailed specifications for HVAC, electrical, and control systems, including insulation, wiring, panelboards, and BACnet communication. Environmental controls, stormwater management, pollution prevention, and hazardous waste management are also critical components. Construction is phased, allowing only one DOAS unit to be down at a time, and cannot commence until new equipment is onsite. A 5-part, labor, and refrigerant warranty will be added.
Contract Details
- Contract Type: Combined Synopsis/Solicitation, implying a fixed-price award based on Lowest Price.
- Estimated Cost Range: $1,000,000 - $5,000,000.
- Completion Period: 720 days after award.
- Liquidated Damages: $880 per Calendar Day.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Buy American Requirement: Applies to Construction Materials.
- Bonds: Bid, payment, and performance bonds are required for proposals over $150K.
- Wage Determination: General Decision Number NC20260010 1/2/2026 Building applies, along with Executive Orders 13706 (Paid Sick Leave) and 13658 (Minimum Wage).
Eligibility & Submission
Only the following Mechanical MACC Contractors are eligible to submit proposals: Mechworks Mechanical Contractors, Inc.; North State Mechanical, Inc.; and R&W Construction Company, Inc. Proposals must be submitted via email to jessica.r.huebner.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil. Award will be based on the Lowest Price. Offerors must acknowledge all amendments, including the latest (0005), which adds FAR Clause 52.222-90 (Addressing DEI Discrimination by Federal Contractors). The DD Form 1354 is not required for this project.
Key Dates
- Proposal Due Date: June 3, 2026, at 1200.
- Published Date: June 2, 2026 (latest amendment).
- Proposal Acceptance Period: 60 days from receipt of offers.