GROUNDS MAINTENANCE FORT STEWART/HAAF

SOL #: W9124M26RA007Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT STEWART
FORT STEWART, GA, 31314-3324, United States

Place of Performance

Fort Stewart, GA

NAICS

Landscaping Services (561730)

PSC

Landscaping/Groundskeeping Services (S208)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jun 12, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for Grounds Maintenance Services at Fort Stewart and Hunter Army Airfield (HAAF), Georgia. This is a 100% Total Small Business Set-Aside for a Firm Fixed-Price (FFP) contract. The services ensure a professional appearance across the installations. Proposals are due June 12, 2026, at 6:00 PM EST.

Scope of Work

This non-personal services contract requires comprehensive grounds maintenance, including mowing, edging, trimming, leaf and debris removal, and policing for Improved (approx. 2,006 acres), Semi-Improved (approx. 774 acres), and Unimproved Areas, Fire Breaks, Ranges, Airfields, and Cemeteries. Specialized maintenance is required for the Warriors Walk Memorial, Cottrell Field, and Quick Track Areas, including care for over 468 White Crape Myrtle trees, tree pruning, replacement, and irrigation. Weed control via herbicide application (requiring certified personnel) and operation/maintenance of irrigation systems are also included. The contractor must provide all personnel, equipment, supplies, and supervision.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP)
  • Set-Aside: 100% Total Small Business
  • NAICS Code: 561730 (Landscaping, Lawn Maintenance)
  • Size Standard: $9.5 Million
  • Period of Performance: A 2-month phase-in (Sept-Oct 2026), followed by a 10-month base year (Nov 2026-Aug 2027), and four (4) 12-month option periods (Sept-Aug), with a potential 6-month extension.
  • Place of Performance: Fort Stewart and Hunter Army Airfield, Georgia.

Submission & Evaluation

Proposals are due June 12, 2026, at 6:00 PM EST. Submissions must be sent electronically via email to both the Contracting Officer, Lacey Turner (lacey.m.turner2.civ@army.mil), and Contract Specialist, Cosmin Popa (cosmin.popa.civ@army.mil). Offerors must disregard any PIEE submission guidance. A detailed price breakdown in a password-protected Excel spreadsheet is required.

Award will be made to the Lowest-Priced Technically Acceptable (LPTA) offeror. Evaluation factors include:

  • Technical Capability: Requires a clear, feasible, and compliant approach to the PWS, including staffing, management, phase-in plans, and specific certifications (Georgia herbicide, landscape experience, memorial/cemetery maintenance experience). State licenses, certifications, and proof of 3-year corporate or personnel experience are excluded from the 10-page limit for Volume II.
  • Past Performance: Evaluated for recency and relevancy, requiring at least 3,000 acres of grounds maintenance experience.
  • Price: Evaluated for reasonableness.

Important Notes

Offerors must be registered in SAM.gov. Compliance with Service Contract Act Wage Determinations (WD #2015-4511 Rev No. 33, WD #2015-4491 Rev No. 33, WD #2015-4485 Rev No. 30) is mandatory for labor costs. Required insurance includes Workmen's Compensation, Employer's Liability, General Liability, Automobile Liability, and Property Damage. Personnel will require background checks, AT Level I, iWATCH, and OPSEC training for installation access. A Phase-in Plan must be submitted with the proposal. Contractor storage areas on-post are subject to specific policies and maintenance standards.

People

Points of Contact

Lacey TurnerPRIMARY
Cosmin PopaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: Jun 4, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jun 1, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
GROUNDS MAINTENANCE FORT STEWART/HAAF | GovScope