41--HVAC Replacement for SH PP and SC PP

SOL #: 140R2026R0011Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
MP-REGIONAL OFFICE
SACRAMENTO, CA, 95825, United States

Place of Performance

Place of performance not available

NAICS

Plumbing (238220)

PSC

Air Conditioning Equipment (4120)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
May 5, 2026
2
Last Updated
Jun 17, 2026
3
Submission Deadline
Jun 20, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation, is soliciting proposals for HVAC Replacement at the Shasta Power Plant (SH PP) and Spring Creek Power Plant (SC PP). This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Proposals are due by June 19, 2026.

Purpose & Scope

This solicitation seeks a contractor to purchase and install three new HVAC units. Two units are for the seventh-floor control room at the Shasta Power Plant, providing both heating and cooling. The third unit is for the computer room at the Spring Creek Power Plant, providing cooling only. The project involves the complete removal of existing HVAC units and their replacement with new R454B refrigerant units that match existing system types and sizes. The contractor will be responsible for providing all necessary construction personnel, equipment, materials, tools, supervision, and Personal Protective Equipment (PPE).

Key Requirements & Deliverables

  • Removal and replacement of existing HVAC units, including condenser units, copper tubing, condensate drains, electrical connections, fan coil units, refrigerant, and controls.
  • Installation of new HVAC units, including placement, mounting brackets, refrigerant, and connection to existing water supply, drainage, and ventilation systems.
  • SHPP units must have inverters for heating and cooling; SCPP unit must provide cooling.
  • Deliverables include one copy of maintenance and operating information, a one-year workmanship guarantee, and product literature.

Contract Details

  • Contract Type: Firm-fixed-price construction contract.
  • NAICS Code: 238220 (Plumbing and Air-Conditioning Contractors) with a $19.0 million size standard.
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • Estimated Price Range: $25,000 to $100,000.
  • Period of Performance: 90 calendar days from the issuance of the Notice-to-Proceed.
  • Bonds: Payment and performance bonds are not required; however, alternative payment protections are necessary.

Submission & Evaluation

  • Proposal Submission Deadline: June 19, 2026, by 1700 local time.
  • Submission Method: Via email to charlesetta_seibure@ios.doi.gov. Proposals should be a single PDF file (preferred), not exceeding 1-5MB or 5 pages total per email.
  • Proposal Content: Must include Technical Approach, Project Schedule, Past Performance, Price Proposal, and Required Documents (amendment acknowledgments, representations/certifications, subcontracting plan).
  • Evaluation Factors: Lowest Price Technically Acceptable (LPTA) source selection process. Evaluation will be based on Technical Acceptability (Pass/Fail), Past Performance (Acceptable/Neutral/Unacceptable), and Price (reasonableness and completeness).

Important Notes

  • Prevailing wage rates, as specified in General Decision Number CA20260007, apply to this project.
  • Offerors must complete and submit "Offeror Responsibility Information" (FAR Part 9) and a Past Performance Questionnaire (PPQ).
  • A "Release of Claims" form (DI-137) may be required at contract close-out.
  • The agency has clarified that certain SAM representations may not be considered, and bidders should rely on the solicitation's requirements.

People

Points of Contact

Seibure, CharlesettaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Jun 17, 2026
View
Version 4
Solicitation
Posted: Jun 15, 2026
View
Version 3
Solicitation
Posted: Jun 15, 2026
View
Version 2Viewing
Solicitation
Posted: May 28, 2026
Version 1
Solicitation
Posted: May 5, 2026
View
41--HVAC Replacement for SH PP and SC PP | GovScope