J--MBIC BOILER REPLACEMENT

SOL #: 140L3626Q0004Combined Synopsis/Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
MONTANA STATE OFFICE
BILLINGS, MT, 59101, United States

Place of Performance

Fort Benton, MT

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 6, 2026
2
Last Updated
Mar 18, 2026
3
Submission Deadline
Mar 17, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Land Management (BLM), has CANCELLED solicitation J--MBIC BOILER REPLACEMENT (Notice ID: bb644a8438b04f9bb2b9521cc4ed58e8) via Amendment 0002, posted on March 18, 2026. The agency plans to resolicit this requirement with a modified Statement of Work (SOW). All offers submitted under the original solicitation are no longer valid.

Original Opportunity Context

This was a Total Small Business Set-Aside for the removal, disposal, and replacement of an existing Patterson Kelly MACH C-450 boiler at the Upper Missouri Breaks National Monument Interpretive Center in Fort Benton, Montana. The original solicitation was a combined synopsis/solicitation (RFQ) for a single award, firm-fixed-price contract under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) and PSC J045 (Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment).

Scope of Original Work

The scope included installing a new boiler of equivalent heating capacity that meets current LEED efficiencies and standards, integrating it into the existing Metasys Building Automation System (requiring Johnson Controls or an authorized representative for integration), and performing all necessary venting, piping, connections, testing, and commissioning. The clarified period of performance was March 1, 2026, through May 1, 2026. A Wage Determination (No. 2015-5397, Rev. 27) was applicable, outlining minimum wage rates and fringe benefits for Montana.

Cancellation Details & Impact

Amendment 0002, posted on March 18, 2026, formally cancels solicitation 140L3626Q0004. The primary reason for cancellation is the intent to issue a new solicitation with a revised SOW. Consequently, all offers previously submitted are invalid. Interested vendors are advised to monitor SAM.gov for the release of the new solicitation.

Contact Information

For general inquiries regarding this requirement, the primary contact is Christopher Brailer at cbrailer@blm.gov or 406-896-5196.

People

Points of Contact

Brailer, ChristopherPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 13, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
J--MBIC BOILER REPLACEMENT | GovScope