Z--MBIC BOILER REPLACEMENT

SOL #: 140L3626Q0011Combined Synopsis/Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
MONTANA STATE OFFICE
BILLINGS, MT, 59101, United States

Place of Performance

Fort Benton, MT

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Heating And Cooling Plants (Z2NB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 18, 2026
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Apr 10, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This solicitation, Z--MBIC BOILER REPLACEMENT (Notice ID: b42f9dce299b4ccda28e541ddbe22d2b), issued by the Bureau of Land Management (BLM), Montana State Office, has been CANCELLED by Amendment 0002, effective April 1, 2026. The requirement for boiler replacement at the Upper Missouri Breaks National Monument Interpretive Center in Fort Benton, Montana, will be re-solicited at a future date.

Original Opportunity Details

The original solicitation was a Total Small Business Set-Aside for the repair or alteration of heating and cooling plants (Product Service Code Z2NB). It sought a contractor to provide all management, supervision, labor, supplies, materials, equipment, and tools for the removal, disposal, and replacement of the existing Patterson Kelly MACH C-450 boiler with a new boiler of equivalent heating capacity. The new boiler was required to meet current LEED efficiency standards and integrate with the Johnson Controls Metasys Building Automation System.

Key Requirements (Original)

  • Replacement of an existing boiler with a new, LEED-compliant unit.
  • Integration with the Johnson Controls Metasys Building Automation System by certified JCBS technicians.
  • Third-party testing and balancing of the hot water system.
  • Compliance with NFPA 70 (2026), IMC (2024), IPC (2024), and IFGC (2024).
  • Period of Performance: 30 days from contract award (originally April 17, 2026, to May 15, 2026, as per Amendment 0001).
  • Location: Upper Missouri Breaks National Monument Interpretive Center, 701 7th Street, Fort Benton, MT.

Cancellation Impact

Amendment 0002 explicitly cancels solicitation 140L3626Q0011. No further proposals will be accepted under this solicitation number. Interested parties should monitor SAM.gov for a new solicitation to be issued at a later date.

People

Points of Contact

Brailer, ChristopherPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Z--MBIC BOILER REPLACEMENT | GovScope