MMIII CABLE ASSEMBLY

SOL #: SPRHA2-26-R-0088Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT OGDEN, UT
HILL AIR FORCE BASE, UT, 84056-5820, United States

Place of Performance

Place of performance not available

NAICS

Power (335311)

PSC

Miscellaneous Electric Power And Distribution Equipment (6150)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 14, 2026
2
Last Updated
Mar 17, 2026
3
Submission Deadline
Apr 25, 2026, 5:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Ogden, UT has issued a solicitation for the procurement of MMIII Cable Assemblies, specifically 50 each of NSN 6150-00-009-9603 AH and 50 each of NSN 6150-00-435-6075 AH. This opportunity is a 100% Total Small Business Set-Aside. The solicitation, initially published on March 17, 2026, has been amended multiple times, with the final proposal due date extended to April 24, 2026.

Scope of Work

Contractors are required to manufacture or source these cable assemblies according to provided drawings. This includes the ability to manufacture parts not obtainable from Flexible Metal Hose for the 69D49223G3 assembly, with Space Vector noted as a previous manufacturer for the W5G cable 69D49203G3. Key requirements include:

  • Manufacturing and Sourcing: Production of specific cable assemblies (NSN 6150-00-009-9603 AH and 6150-00-435-6075 AH).
  • Technical Data: Adherence to detailed Engineering Data Lists (EDLs) for both NSNs, which specify components, procurability notes (including lead times up to 360 days for some parts), and approved alternatives.
  • Quality & Compliance: Submission of a First Article Test Report (CDRL A001) and a Counterfeit Prevention Plan (CDRL A002). Compliance with MIL-STD-130 for physical item markings, IUID requirements, and On-Time Delivery (OTD) improvement initiatives.
  • Packaging & Marking: Strict adherence to military standards (e.g., MIL-STD-2073-1, MIL-STD-129, ISPM 15, ESD protective packaging) for preservation, packaging, and marking of materials.
  • Export Control: Mandatory treatment of any unmarked engineering drawings as "DISTRIBUTION D," restricting distribution to DoD and U.S. DoD contractors only, due to critical technology and export control laws. Severe penalties apply for non-compliance.

Contract Details

  • Type: Solicitation (implied Firm Fixed Price based on line item details).
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • Offers: Must be held firm for 120 days.

Submission & Evaluation

  • Proposal Due: April 24, 2026.
  • Evaluation Factors: Proposals will be evaluated primarily on Price or Cost, which is considered the most important factor. All other factors are significantly less important. First Article testing costs will also be a factor in the evaluation.

Amendments

  • Amendment 1 (Feb 10, 2026): Modified quantities for CLINs 0001AC, 0001AD, 0002AC, and 0002AD.
  • Amendment 2 (Mar 02, 2026): Extended offer due date to March 20, 2026.
  • Amendment 3 (Mar 17, 2026): Further extended offer due date to April 24, 2026.

Contact Information

For inquiries, contact Kody Quayle at kody.quayle@us.af.mil.

People

Points of Contact

Kody QuaylePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: Mar 17, 2026
Version 5
Solicitation
Posted: Mar 3, 2026
View
Version 4
Solicitation
Posted: Mar 2, 2026
View
Version 3
Solicitation
Posted: Feb 10, 2026
View
Version 2
Solicitation
Posted: Feb 2, 2026
View
Version 1
Sources Sought
Posted: Jan 14, 2026
View