N--Provide Replacement of Video Surveillance System
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS) is soliciting proposals for the Replacement of Video Surveillance Systems at the Martin Luther King, Jr. National Historic Park in Atlanta, GA. This is a Firm Fixed-Price contract, designated as a Women-Owned Small Business (WOSB) set-aside. Proposals are due by June 01, 2026, at 5:00 PM EDT.
Scope of Work
This opportunity requires providing all necessary material, labor, and supervision for the comprehensive replacement of video surveillance systems across multiple park locations. These locations include the Visitor Center, Parking Lot Cluster, Bus Cameras, Tennis Court Cameras, Maintenance Building Cluster, Auburn East Cluster, Auburn West Cluster, and the King Family Home. All work must strictly adhere to detailed project specifications and construction design plans. Davis Bacon prevailing wages are applicable for this project.
Contract Details
- Type: Firm Fixed-Price Contract
- Set-Aside: Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- NAICS Code: 236220 (Commercial and Institutional Building Construction) with a $45,000,000.00 size standard
- Estimated Magnitude: Between $1,000.00 to $5,000,000.00
- Period of Performance: June 15, 2026, to June 14, 2027
- Required Bonds: 100% Performance Bond, 100% Payment Bond, and a 20% Bid Bond are mandatory.
- Pre-NTP Requirements: Notice to Proceed (NTP) is contingent upon the receipt and approval of Performance and Payment Bonds, Certificate of Liability Insurance, Contract Specific Safety Plan, Work Schedule, and Material Submittals.
- Subcontracting Limits: For small business set-asides, general construction has a maximum 85% subcontracting limit to non-similarly situated subcontractors.
Key Clarifications & Requirements
- Installation: Detailed guidance is provided on wire concealment (conduit/wire mold where feasible), wireless bridge Line of Sight (LOS) design, contractor responsibility for power provision for new poles, and fiber installation methods. Construction drawings (CD set) govern in cases of discrepancies unless superseded by an addendum.
- Historic Preservation: Due to the historic nature of the site, exterior mounting, conduits, colors, drilling, and visibility require specific input and approval from Cultural Resources / SHPO / NEPA.
- Cybersecurity: Proposed products must undergo and be certified for successful cyber vulnerability testing.
- Wage Rates: Prevailing wage rates for Fulton County, GA, as per the provided wage determination, must be used.
Submission & Evaluation
- Evaluation: Lowest Price Technically Acceptable (LPTA).
- Proposal Submission: Via email to edward_dingle@nps.gov.
- SAM.gov: Offerors must possess an active vendor record in SAM.gov.
- Required Forms: Bidders must complete and submit a Past Performance Questionnaire (listing up to five similar projects), a detailed Price Schedule for all line items (base and options), and Standard Form 1413 (Statement and Acknowledgment).
Key Dates
- Site Visit (Mandatory): May 12, 2026, 09:30 AM EDT (RSVP required by May 11, 2026, 3:00 PM EDT).
- Questions Due: May 15, 2026, 1:00 PM EDT.
- Proposals Due: June 01, 2026, 5:00 PM EDT.
- Published Date: May 21, 2026 (latest amendment).
Contact Information
Primary Contact: Edward Dingle (edward_dingle@nps.gov, 404-507-5747).