NOS WSR - Data Center Infrastructure

SOL #: W50S7X-26-Q-A003Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7M9 USPFO ACTIVITY KSANG 184
MCCONNELL AFB, KS, 67221-9000, United States

Place of Performance

PRAIRIE VLG, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
Apr 2, 2026
3
Submission Deadline
Apr 9, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, through the W7M9 USPFO ACTIVITY KSANG 184, is soliciting proposals for Data Center Infrastructure for the 299th Network Operations Squadron (NOS) at McConnell AFB, KS. This is a Total Small Business Set-Aside for engineering, design, procurement, and installation of a complete data center solution. Quotations are due by April 9, 2026, at 1:00 PM CST.

Scope of Work

The contractor will engineer, design, procure, and install a functional data center solution. Key components include:

  • Racks/Cabinets: Thirty-eight (38) server/network racks with specific dimensions and features (e.g., side panels, air dams, blanking panels, 3,000 lbs load rating).
  • Aisle Containment: Two cold aisle containment systems (one 28-rack, one 14-rack) with doors, ceilings, and partitions.
  • Power Distribution Units (PDUs): Seventy-six (76) metered PDUs (two per rack) with L6-30P plugs, 30 Amp, 208/240V, and local LCD screens.
  • Environmental Monitoring System (Optional CLIN 0002): A NIPRNET-approved system with current or pending Authority to Connect (ATC), remote accessibility, AD/LDAP authentication, and various sensors (temperature/humidity, water/leak, airflow, smoke, door contacts).

Important Clarification: This project is strictly for data center infrastructure (racks, power, containment); it does not include low-voltage data cabling (CAT6, fiber optic), ladder rack, general facility cable tray, backboards, or patch panels.

Contract Details

  • Contract Type: Firm-Fixed Price (FFP).
  • Period of Performance: 180 days from the date of award.
  • Place of Performance: Room 281, Building 54, 52010 Jayhawk Drive, McConnell AFB, KS 67221.
  • On-Site Installation Window: Firmly scheduled for July 8, 2026, to July 21, 2026 (14 calendar days). The start date is subject to a formal Authorization to Proceed (ATP) issued at least 30 days prior.
  • Funding Note: "Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available."

Set-Aside & Eligibility

  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238210 (Electrical and Other Wiring Installation Contractors).
  • Size Standard: $19,000,000.

Submission & Evaluation

  • Submission Deadline: April 9, 2026, at 1:00 PM CST.
  • Submission Method: Electronic submission to 184WG.MSG.CONTRACTING@us.af.mil. Quotes must be in MS Office 2013 compatible formats (Word, Excel, PDF) and not password protected.
  • Evaluation Criteria: Award will be made to the Lowest Price Technically Acceptable (LPTA) offeror, based on Price, Technical Factor, and Schedule/Delivery. Past performance is not required and will not be evaluated.
  • Quote Acceptance Period: Offerors must specify a quote acceptance period of not less than 60 days.
  • All or None: Offers must be submitted for all requirements.

Key Clarifications & Notes

  • Site Visit: A voluntary site visit for Building 54, Room 281 is available. Interested parties should email 184WG.MSG.CONTRACTING@us.af.mil to schedule.
  • "Or Equal" Products: Acceptable for racks, containment systems, and PDUs if they meet or exceed specifications.
  • Environmental Monitoring System: Must be on the DoDIN Approved Products List (APL) at submission and have a current or pending ATC by installation.
  • Work Hours: Standard hours are 0730-1630 CST, Monday-Friday. Extended hours (nights, weekends, holidays) are authorized and expected to meet the completion date.
  • SCIF Accreditation: All permanently installed equipment must be compliant with standards for future Sensitive Compartmented Information Facility (SCIF) accreditation, with non-RF transmitting features.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
NOS WSR - Data Center Infrastructure | GovScope