P--GRSM Recreation Building at LeConte Lodge Demoliti

SOL #: 140P5326R0008Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States

Place of Performance

Gatlinburg, TN

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Buildings (P400)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 10, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 10, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), Department of the Interior, is soliciting proposals for the demolition of the Recreation Building at Mt. LeConte Lodge within the Great Smoky Mountains National Park, Gatlinburg, TN. This is a Firm Fixed-Price contract set aside for Total Small Businesses. The project involves working in a remote, high-elevation location with limited access. Proposals are due April 10, 2026, at 5:00 PM EDT.

Scope of Work

The contractor will deconstruct and demolish the entire Recreation Building and its associated features, including logs, roofing, beams, concrete footers, stone foundation, and decking. All demolished materials must be removed and legally disposed of off-site. Specific materials, including approximately 900 sq ft of interior wooden tongue & groove boards, three waterless urinals, 30 linear feet of copper piping, two Kwikset door handle/dead bolt sets, and 800 cubic feet of stone foundation material, must be salvaged and stockpiled on-site. The site must be graded for positive drainage, seeded, and covered with natural fiber roll.

Key Requirements & Logistics

The project site is remote, accessible only by foot or airlift. The contractor is responsible for procuring airlift services, conforming to FAA and HAZMAT regulations, and obtaining a Special Use Permit (SUP). The site lacks water, gas, electrical, internet, and cell services. Two parking spaces are allocated at Alum Cave Trailhead. Work hours are restricted, especially when the lodge is operational (noise-intensive work 9:30 AM - 12:30 PM). NPS lodging (bunkhouse) is available for up to four consecutive weeks. Bidders should review available services and equipment from the concessioner and Crowder Construction, though these are not guaranteed by the contract. A Site-Specific Safety Plan (SSSP), Quality Control Plan (QCP), and Accident Prevention Plan (APP) are mandatory.

Contract Details

  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 238910 Site Preparation Contractors ($19M size standard)
  • Period of Performance: April 15, 2026, to August 1, 2026. Demolition is anticipated to take 4 weeks.

Submission & Evaluation

Proposals are due via email to Ashley_Warcewicz@nps.gov by April 10, 2026, at 5:00 PM EDT. Award will be based on a Lowest Price Technically Acceptable (LPTA) evaluation. Technical proposals will be assessed on a pass/fail basis, requiring completion of the LPTA Technical Acceptability Template (Attachment A5), which includes details on relevant experience, key subcontractors, and SOW compliance. Offerors must be registered in SAM prior to award.

Important Notes

A site visit was tentatively scheduled for March 31, 2026, involving a 10-mile hike with significant elevation gain. Offerors were encouraged to inspect the site at any time. Clarifications from Q&A indicate no government-provided internet, and contractor responsibility for special use permits and site surveys. Wage Determination (Attachment A2) applies.

People

Points of Contact

Warcewicz, AshleyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View
P--GRSM Recreation Building at LeConte Lodge Demoliti | GovScope