Pavement Repair

SOL #: 12639526Q0110Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Memphis, TN

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 15, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service, is seeking quotes for Pavement Repair at the Memphis Cotton Classing Facility in Memphis, TN. This is a Total Small Business Set-Aside opportunity for the replacement of the entire paved area, which is in severe disrepair. The project is anticipated to be a Firm-Fixed-Price contract with an estimated value between $500,000 and $1,000,000. Quotes are due May 15, 2026, at 5:00 PM Z (12:00 PM CT).

Scope of Work

The project involves the comprehensive replacement of the entire paved area at the facility, which suffers from poor drainage and subbase degradation. Key tasks include:

  • Full-depth sawcuts, removal, and disposal of existing pavement and base material.
  • Reworking the subgrade to Tennessee Department of Transportation (TDOT) standards.
  • Placing and compacting crushed stone base and applying a Hot Mix Asphalt Concrete (HMAC) surface.
  • Cleaning and sealing cracks, conditioning surfaces to TDOT standards, and applying a fog seal.
  • Restriping the new pavement with acrylic paint to match existing markings. The work will be executed in a phased approach (front parking, side driveway, rear paved area) to minimize operational impact, with a lump sum award anticipated. The entire project must be completed by August 30, 2026.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ)
  • Contract Type: Firm-Fixed-Price
  • Estimated Value: $500,000 - $1,000,000
  • Set-Aside: Total Small Business (FAR 19.5)
  • Place of Performance: Memphis Cotton Classing Facility, Memphis, TN 38133
  • Quotes Due: May 15, 2026, 5:00 PM Z (12:00 PM CT)
  • Questions Due: May 12, 2026, 12:00 PM CT
  • Site Visit: April 29, 2026, 10:00 AM CT at 3275 Appling Rd, Memphis, TN 38133

Evaluation

Award will be based on a Lowest Price, Technically Acceptable (LPTA) approach. Technical acceptability will be determined by relevant experience with similar paving work. Past performance will be assessed based on contractor reputation and adherence to schedules. The government intends to award without negotiations.

Special Requirements & Notes

  • Adherence to Federal Construction Wage Rates for Shelby County, TN (Attachment 3) is mandatory.
  • All materials and workmanship must comply with the latest edition of the Tennessee Department of Transportation's "Standard Specifications for Road and Bridge Construction."
  • The project may require three mobilizations depending on the necessary schedule.
  • A sinkhole identified in RFIs should be cleared, debris removed, filled with appropriate material (e.g., 3/4" gravel), and asphalted.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 15, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View