Repair of Hoop Buildings

SOL #: 12639526Q0111Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Ames, IA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 20, 2026, 1:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA National Centers for Animal Health (NCAH) in Ames, IA, is soliciting proposals for the repair of six Hoop Buildings (H1-H6) that sustained damage from windstorms. This opportunity is a Total Small Business Set-Aside and requires contractors to provide all labor and materials for specified repairs and inspections. Proposals are due May 20, 2026, at 8:30 AM CT.

Scope of Work

The contractor shall perform comprehensive repairs and maintenance on Hoop Buildings H1 through H6. Key tasks include:

  • H1: Replace East end cover, install new end door, patch membrane, replace damaged metal siding and corner covers, replace wood blocks, install gravel bed. Inspect straps, cables, winches, and bolts.
  • H2: Replace damaged wood blocks, metal siding, and corner covers (specifically the outside NE corner). Inspect straps, cables, winches, and bolts.
  • H3: Remove and replace existing end and top covers, replace weather stripping, damaged metal siding, and metal corners. Inspect straps, cables, winches, and bolts. USDA will move equipment to facilitate work.
  • H4: Replace damaged metal wall siding panels. Inspect straps, cables, winches, and bolts.
  • H5: Install new top cover. Inspect straps, cables, winches, and bolts (cattle will be moved).
  • H6: Install new saddle brackets and diagonal brace pipes for overhead door support, replace East exterior door, and replace damaged metal wall siding panels. Inspect straps, cables, winches, and bolts (work to be completed before H3 repairs). Contractor is responsible for furnishing all materials for diagonal braces.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1JZ (Construction Of Miscellaneous Buildings)
  • Period of Performance: 360 days from Notice to Proceed.
  • Response Date: May 20, 2026, 8:30 AM CT (as amended).
  • Published Date: May 7, 2026.
  • Place of Performance: USDA National Centers for Animal Health, Ames, IA.

Special Requirements & Clarifications

  • Site Access: Strict access control, contractor ID badges, and specific identification requirements for entry to NCAH facilities. Contractors wishing to attend the site visit (held May 5, 2026) were required to send names by May 1.
  • Work Hours: Regular hours are 7:00 AM - 3:30 PM, Monday-Friday; work outside these hours requires COR approval.
  • Experience: Contractors must have at least 5 years of experience repairing commercial hoop buildings.
  • Materials: Specific material requirements for cladding membrane (Duraweave or equal, fire retardant, UV stabilized) and adherence to federal construction wage rates for Story County, IA.
  • Warranty: A three-year warranty for workmanship and materials is required.
  • Work Sequencing: Work for Building H1 should be completed before Building H3 to allow for equipment movement.

Attachments & Resources

Solicitation documents include a detailed Statement of Work, Drawings, Hoop Building Inspection Checklist, photos of damaged buildings (H1-H6), technical specifications for cladding, federal construction wage rates, and an example of diagonal cross brace installation. RFIs and responses provide further clarifications on repair methods and responsibilities.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: May 7, 2026
Version 5
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View