Replace AHUs 2,5,7 at Sablich Center

SOL #: FA301026R0007Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3010 81 CONS CC
KEESLER AFB, MS, 39534-2701, United States

Place of Performance

Biloxi, MS

NAICS

Plumbing (238220)

PSC

Installation Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (N041)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
May 26, 2026
3
Submission Deadline
Jun 1, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the replacement of Air Handling Units (AHUs) 2, 5, and 7 at the Sablich Center, Building 701, Keesler AFB, Biloxi, MS. This acquisition is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with an estimated construction magnitude between $1,000,000.00 and $3,000,000.00. Proposals are due June 1, 2026, at 11:00 AM CST.

Scope of Work

The project requires the demolition and in-kind replacement of three existing rooftop AHUs (2, 5, and 7). Key tasks include:

  • Demolishing old breakers, disconnect switches, and wiring (only one AHU at a time).
  • Replacing 6" branch take-offs with new 8" branch take-offs, volume control dampers, and 8" flexible ducts.
  • Installing new breakers, disconnect switches, and wiring for each new AHU.
  • Repairing roof curbs and roofs to eliminate thermal, moisture, and weather intrusion.
  • Anchoring new AHUs and curbs according to UFC hurricane criteria.
  • Testing, Adjusting, and Balancing (TAB) the completed system to ensure positive pressure.
  • Compliance with local, state, and federal codes (IBC, UFC, AFI, NFPA, NEC, ABA).
  • Off-site disposal of demolished materials; no on-site stockpiling.
  • Maintaining continuous facility operations during the 210-calendar day performance period.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: 210 calendar days from the date of award.
  • Estimated Value: Between $1,000,000.00 and $3,000,000.00.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • Evaluation Method: Lowest Price Technically Acceptable (LPTA).
  • Product Service Code: N041 (Installation Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment).

Key Dates & Actions

  • Pre-bid Site Visit: Held on April 30, 2026. Sign-in sheet and Q&A (Attachment 10) are available.
  • Questions Due: May 4, 2026 (passed). Q&A document provides clarifications on personnel roles, plans, tax exemption, drawings, ductwork, controls, asbestos, and AHU 6 (not included).
  • Proposal Due Date: June 1, 2026, at 11:00 AM CST. (Extended by Amendment 0002).
  • Wage Determination: Updated Wage Determination (MS20260050, May 18, 2026) is provided and must be used.

Important Notes

  • Funds are not presently available for this effort; award is contingent upon availability of funds. The Government reserves the right to cancel the solicitation.
  • Offerors must acknowledge all amendments, including Amendment 0001 (adding DEI discrimination clause and Q&A) and Amendment 0002 (extending due date and updating wage determination).
  • Proposals must be prepared according to Section L and evaluated per Section M.
  • Bidders must complete Past Performance Reference Lists (L-01) and ensure references submit Questionnaires (L-02).
  • Submittal procedures (Attachment 5) and the Material Submittals Schedule (Attachment 6) detail required documentation and timelines.
  • Addendum 1 informs contractors of a potential unforeseen condition regarding lightweight concrete during AHU removal.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: May 26, 2026
Version 3
Solicitation
Posted: May 7, 2026
View
Version 2
Solicitation
Posted: Apr 30, 2026
View
Version 1
Solicitation
Posted: Apr 23, 2026
View
Replace AHUs 2,5,7 at Sablich Center | GovScope