Replace Chiller York 2075
SOL #: N4008526R0109Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States
Place of Performance
Yorktown, VA
NAICS
Plumbing (238220)
PSC
Maintenance Of Miscellaneous Buildings (Z1JZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 6, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
May 20, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, has issued a Solicitation (e0160efa1408423ebf95b6cae035516f) for the Replacement of Chiller York 2075 at Naval Weapons Station Yorktown, Virginia. This project involves decommissioning, relocating, and installing a new high-efficiency 100-ton air-cooled scroll packaged chiller. This is a Total Small Business Set-Aside task order under an existing ID/IQ Multiple Award Construction Contract (MACC). Proposals are due May 20, 2026, at 1400 EST.
Scope of Work
The contractor shall provide all supervision, labor, material, and equipment to:
- Decommission the existing 100-ton chiller.
- Relocate the existing chiller approximately two miles to a new site near York 1595.
- Supply, install, and commission a new high-efficiency 100-ton air-cooled scroll packaged chiller at the original location (York 2075).
- Replace all insulation, heat tape, aluminum jacketing, pressure, and temperature gauges on water lines above the existing concrete pad.
- Ensure the new chiller meets or exceeds specified technical specifications, including capacity, electrical requirements, and R-454B refrigerant type.
- Perform testing and balancing of chilled water flow, including a minimum four-hour continuous run under building load.
- Integrate the new chiller with the Building Automation System (BAS) via BACnet MS/TP interface.
- Comply with Unified Facilities Criteria (UFCs), industry standards, and all applicable federal, state, and local codes.
Contract Details
- Contract Type: Task Order under an existing Design-Build (DB) / Design-Bid-Build (DBB) Indefinite Delivery/Indefinite Quantity (ID/IQ) Multiple Award Construction Contract (MACC).
- Estimated Price Range: $250,000 - $500,000.
- Period of Performance: 375 calendar days from notice to proceed for commencement of work, and 375 calendar days from award for completion. Construction is preferred between November and April.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Eligibility: Only listed HVAC MACC contract holders (N4008524D2508/2509/2510/2511/2512) can submit a proposal.
Submission & Evaluation
- Pre-Proposal Inquiries (PPIs): Submit questions in writing via email to kiana.m.owens.civ@us.navy.mil and maurice.n.muse.civ@us.navy.mil using the Pre-Proposal Inquiry (PPI) form (Attachment G) by April 29, 2026, at 1400 EST.
- Site Visit: A mandatory site visit will be held on April 16, 2026, at 0800 EST at Naval Weapons Station Yorktown, VA, in front of Gate 3.
- Proposal Due Date: Wednesday, May 20, 2026, at 1400 Eastern Standard Time. Late proposals will not be accepted.
- Submission Method: Electronic proposals (.pdf format) must be submitted via the PIEE Solicitation Module only. Maximum file size is 1.9 GB. Refer to Attachment D for PIEE Vendor Access Instructions.
- Evaluation: Award will be made to the responsible Offeror offering the best value. For this specific task order, evaluation will be based on price only (lowest price source selection).
Key Requirements & Notes
- All terms and conditions of the base MACC contract apply.
- Wage Determination: Department of Labor (DoL) General Decision Number VA20260169 01/30/2026 applies. Bidders must comply with prevailing wage rates.
- Bond Requirements: Offerors must furnish bonds per Clause 52.228-15 within 10 days after receipt of award.
- Attachments include: Site Location Map and Photos (A), SOW (B), Wage Determination (C), PIEE Vendor Access Instructions (D), Price Proposal Form (F), and PPI Form (G).
People
Points of Contact
Kiana OwensPRIMARY