Roof Repairs BEQ HP145 & HP175
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Roof Repairs at Bachelor Enlisted Quarters (BEQ) HP145 & HP175 at Marine Corps Base Camp Lejeune, NC. This is a Combined Synopsis/Solicitation (N40085-26-R-9033) set aside for Total Small Business. Only pre-selected Roofing MACC Contractors are eligible to submit proposals. The estimated cost range is $1,000,000 to $5,000,000, with proposals due by May 29, 2026, at 3:00 PM EST.
Scope of Work
The project involves replacing existing shingle roof systems with new aluminum standing seam metal roofing systems on BEQ buildings HP145 and HP175. Key tasks include:
- Removal and disposal of existing roof systems down to the deck.
- Replacement of up to 10% of damaged decking and repair of damaged truss framing members (assume 231 Linear Feet per building for bidding).
- Installation of new aluminum drip edge (Bone White), self-adhering ice and water membrane, and elastomeric expansion joints.
- Installation of a new aluminum standing seam metal roof with a vented ridge cap (color: Suede, as clarified by Amendment 0002).
- Installation of pipe boots on existing vent pipes and permanent fall protection.
- Repair and refinish areas damaged or disturbed by new work.
Special Considerations & Requirements
- Operational Facility: The facility will remain operational throughout the construction period, requiring minimal interference from the contractor.
- Hazardous Materials: Lead-based paint is present on fascia. Asbestos-containing materials (ACM) may be present, and ACM reports for HP145 and HP175 have been provided via Amendment 0003. Contractors must adhere to specific procedures for disposal and remediation. UXO awareness training is required for ground-disturbing activities.
- Site Operations: Contractors must coordinate site access, staging areas, and security. Regular working hours are 0730-1600, Monday through Friday. After-hours work and utility interruptions require advance written notice.
- Environmental Compliance: Strict adherence to the