Sacramento River Erosion Contract 3
SOL #: W9123826BA006Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States
Place of Performance
Place of performance not available
NAICS
Other Heavy and Civil Engineering Construction (237990)
PSC
Construction Of Tunnels And Subsurface Structures (Y1LC)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Nov 20, 2025
2
Last Updated
Mar 27, 2026
3
Submission Deadline
Mar 27, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, U.S. Army Corps of Engineers, Sacramento District, has posted an Abstract of Offers for the Sacramento River Erosion Contract 3 (Solicitation W9123826BA006). Offers for this construction opportunity were opened on March 27, 2026. This notice provides details on the received bids and recent amendments, including a change to the bid acceptance period.
Project Scope
This contract involves comprehensive erosion control and construction services along the Sacramento River. Key tasks include:
- Mobilization and Demobilization
- Temporary Storm Water Pollution Control
- Clearing and Grubbing
- Installation of Graded Stone (Type C and Soil-Filled) and Aggregate Base
- Topsoil application, Grass Seeding, and Erosion Control
- Placement of In-Stream Wood Material and Beaver Barrier Fence
- Demolition and Removal of existing items, specifically Boat Dock Removal at multiple locations (e.g., Sta 1380+80, 1383+00, 1429+20). The demolition scope requires adherence to EM 385-1-1, Section 23, and submission of a Removal Plan.
Contract Details & Status
- Opportunity Type: Solicitation (Offers Received)
- Notice ID: 6a375131169b48b09f24d80292e74dd7
- Product/Service Code: Y1LC - Construction Of Tunnels And Subsurface Structures
- Agency: DEPT OF DEFENSE / DEPT OF THE ARMY / W075 ENDIST SACRAMENTO
- Solicitation Issued: December 16, 2025
- Offers Opened: March 27, 2026
- Amendments: A total of 9 amendments were issued. Amendment 0009 specifically changed the Bid Acceptance period from 60 to 90 days. Amendment 0003 revised Specification Section 01 22 00 ("Price and Payment Procedures") to include "and disposal" for optional CLINs and added a new Specification Section 02 41 00 ("Demolition and Removals").
Abstract of Offers
The posted Abstract of Offers (OF 1419, parts 1-4) details bids received from:
- Odin Environmental Solutions, LLC
- SMCI Obayashi Joint Venture, LP
- The Dutra Group
- Trade West Construction Inc. These documents provide specific pricing for various contract items, including estimated unit prices and amounts, and confirm acknowledgment of amendments by the offerors. Section 01 22 00 outlines the detailed pricing and payment procedures for single job and unit price items, as well as invoice submission requirements.
Contact Information
- Primary: Julie Maxwell (julie.maxwell@usace.army.mil, 916-557-7989)
- Secondary: Jennifer Wheelis (Jennifer.l.wheelis@usace.army.mil)
People
Points of Contact
Julie MaxwellPRIMARY
Jennifer WheelisSECONDARY
Files
Versions
Version 15Viewing
Solicitation
Posted: Mar 27, 2026
Version 14
Solicitation
Posted: Mar 25, 2026
Version 13
Solicitation
Posted: Mar 3, 2026
Version 12
Solicitation
Posted: Feb 20, 2026
Version 11
Solicitation
Posted: Feb 18, 2026
Version 10
Solicitation
Posted: Feb 5, 2026
Version 9
Solicitation
Posted: Feb 3, 2026
Version 8
Solicitation
Posted: Jan 26, 2026
Version 7
Solicitation
Posted: Jan 23, 2026
Version 6
Solicitation
Posted: Jan 20, 2026
Version 5
Solicitation
Posted: Jan 20, 2026
Version 4
Solicitation
Posted: Jan 8, 2026
Version 3
Solicitation
Posted: Jan 6, 2026
Version 2
Solicitation
Posted: Dec 16, 2025
Version 1
Pre-Solicitation
Posted: Nov 20, 2025