SSRL B116 & B132 BPM HVAC Replacement

SOL #: SLAC_RFP_363431Sources Sought

Overview

Buyer

Energy
Energy, Department Of
SLAC Natl Accel Lab -DOE Contractor
Menlo Park, CA, 94025, United States

Place of Performance

Menlo Park, CA

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Mar 31, 2026
2
Last Updated
Apr 2, 2026
3
Response Deadline
Apr 13, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy (DOE), is issuing a Request for Proposal (RFP) #363431 for the SSRL B116 & B132 BPM HVAC Replacement Project. This is a Firm Fixed-Price construction subcontract to replace HVAC systems in critical Beam Position Monitor (BPM) Rooms. Proposals are due April 30, 2026.

Scope of Work

The project involves the complete removal and replacement of existing HVAC systems in SSRL Buildings 116 and 132. This includes demolition of old equipment, installation of new Vertiv Liebert HVAC units, ductwork, refrigeration piping, condensate lines, and associated electrical infrastructure. All work must comply with SLAC, DOE, and ES&H standards, as well as BIO adopted codes. Work is primarily scheduled during SSRL's Summer 2026 shutdown (July 21 - August 31, 2026), with potential phasing into the Summer 2027 shutdown if long-lead equipment procurement requires.

Contract Details

  • Contract Type: Firm Fixed-Price Subcontract
  • Period of Performance: Phase 1: July 21, 2026 – September 15, 2026. Phase 2 (if needed): July 2027 – September 2027.
  • Place of Performance: SLAC National Accelerator Laboratory, Menlo Park, CA.
  • Set-Aside: None specified.

Key Dates

  • Proposal Due Date: April 30, 2026, at 10:00 AM PST
  • Site Visit: April 14, 2026, at 9:30 AM PST (meet at Building 53)
  • Questions & Inquiries (RFIs) Due: April 23, 2026, COB
  • Site Visit Attendee List Due: April 9, 2026

Evaluation Factors

Award will be made on a Lowest-Price Technically Acceptable (LPTA) basis. Technical proposals will be evaluated on a "Meets/Does Not Meet" basis across five factors:

  1. Technical Approach: Understanding of scope, planning, QA/QC.
  2. Safety: ES&H program, compliance history, Safety Qualification Form (SQF).
  3. Schedule & Phasing Plan: Adherence to SOW and multiyear execution plan.
  4. Project Management & Experience: Methodologies, key personnel qualifications, relevant past projects.
  5. Statement of Qualifications: Valid California contractor's license, local SF Bay Area office (3+ years), experience with DOE National Laboratories. Price proposals will be assessed for completeness, realism, and reasonableness.

Eligibility & Requirements

Offerors must be registered in good standing with SAM and the University's procurement system, possess a current Safety Qualification Form, and hold a valid California contractor's license. A local San Francisco Bay Area office (established for at least three years) and proven experience with DOE National Laboratories or similar facilities are required. Davis-Bacon Act requirements apply.

Additional Notes

Proposals must be submitted electronically in searchable PDF format. All communications must be directed to Doreen Agbayani (doreena@slac.stanford.edu). Offerors are strongly encouraged to attend the site visit.

People

Points of Contact

doreen agbayaniPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Sources Sought
Posted: Apr 2, 2026
Version 2
Sources Sought
Posted: Mar 31, 2026
View
Version 1
Sources Sought
Posted: Mar 31, 2026
View
SSRL B116 & B132 BPM HVAC Replacement | GovScope