TINKER AFB MAC BOA WWYK150083 - Repair Transformer Vault 6, B9001
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals from Tinker AFB MAC BOA Holders ONLY for the Repair of Transformer Vault 6, Building 9001 at Tinker Air Force Base, Oklahoma. This project involves the replacement of critical electrical infrastructure. This is a Total Small Business Set-Aside. Proposals are due by April 10, 2026, at 4:00 PM CST.
Scope of Work
The project, designated WWYK150083, requires furnishing all materials, labor, and equipment to repair and replace components within Transformer Vault 6, Building 9001. Key tasks include:
- Replacement of two gas-filled 2000KVA transformers.
- Replacement of associated 480V switch gear (labeled #6C and #6D).
- Replacement of all 15KV switches.
- Replacement of the original 3000A tie bus.
- Replacement of interior lighting.
- Installation of visual fire alarm notification devices to meet ABA requirements.
- Repair of the vault's exterior.
Key Requirements & Clarifications
- Eligibility: Only Tinker AFB MAC BOA Holders who attended the mandatory initial site visit on February 5, 2026, are eligible to propose.
- Transformers: Existing transformers are gas-filled, not oil-filled, and do not require PCB testing or disposal.
- Busway Transition: Custom busway adapters are intended to extend the existing ITE XL-X busway to the new gear.
- Metering: Base standard ION8650 meters are expected; externally mounted meters are acceptable if they cannot be mounted to the switchgear.
- Phasing: Demo work must be phased to minimize production impact, requiring coordination with the user group.
- Electrical Standards: The project will adhere to the 2025 Tinker AFB electrical standards.
- Hoist System: Contractors must install and remove their own hoist system; the existing hoist beam is damaged and not to be used.
- Arc Flash: Arc-flash mitigation techniques shall be used; arc-resistant gear is not suitable due to footprint and lead time.
- Personnel: Key personnel (Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) must meet specific experience requirements. All personnel require AFMC Form 387 badges for base access.
- Quality Control: Contractor is responsible for a comprehensive inspection system and documentation.
- Submittals: A detailed Submittal Register outlines all required documentation throughout the project lifecycle.
Contract Details & Timeline
- Contract Type: Negotiated (RFP)
- Magnitude: Between $1,000,000 and $5,000,000.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Performance Period: 10 calendar days to commence work after Notice to Proceed (NTP), with 271 calendar days for completion.
- Liquidated Damages: $277.75 per calendar day for delays.
- Proposal Due Date: April 10, 2026, at 4:00 PM CST.
- Additional RFI Questions Due: March 25, 2026, at 4:00 PM CST.
- Place of Performance: Tinker Air Force Base, Oklahoma (Building 9001, Transformer Vault 6).
Submission & Evaluation
Proposals must be submitted by the deadline. Offerors are instructed to refer to Section L (Instructions to Offerors) and Section M (Evaluation Factors for Award) in the solicitation for specific submission requirements and evaluation criteria. Performance and Payment Bonds are required.
Important Notes
This opportunity is exclusively for Tinker AFB MAC BOA Holders. Attendance at the initial site visit on February 5, 2026, was mandatory for eligibility.