TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the Renovation of Restrooms in Building 117 (B117) at Tinker Air Force Base, Oklahoma. This project, designated WWYK190023, is a Design-Bid-Build effort to completely demolish and replace existing plumbing fixtures, domestic piping, and sanitary sewer systems in both men's and women's restrooms. This opportunity is restricted to Small Business MAC BOA Holders ONLY who attended the mandatory site visit on May 14, 2026. Proposals are due June 29, 2026.
Scope of Work
The renovation involves comprehensive demolition and replacement of all plumbing fixtures, domestic piping to isolation valves, and sanitary sewer systems in B117 restrooms. The facility will remain occupied during construction, requiring the contractor to provide portable bathrooms and showers. Construction will be phased, with the men's restroom completed before the women's. Key deliverables include a baseline construction schedule, progress reports, working documents (reflected ceiling, utility, plumbing, lighting plans), and record drawings. Foreign Object Debris (FOD) awareness and prevention training is mandatory for all personnel.
Eligibility & Restrictions
This is a Total Small Business Set-Aside (FAR 19.5). Crucially, only MAC BOA Holder General Contractors who attended the mandatory site visit on May 14, 2026, are eligible to propose. Personnel requiring base access must complete an Entry Access List (EAL) form.
Contract Details
- Contract Type: Firm Fixed Price
- Period of Performance: Work must begin within 10 calendar days after award and be completed within 625 calendar days.
- Place of Performance: Tinker AFB, S Coffeyville, OK.
Key Requirements & Deliverables
Contractors must adhere to extensive general requirements, including detailed safety (OSHA, EM 385-1-1), environmental (hazardous materials, waste management), and quality control (QC Plan, DQC Plan) standards. Submittal procedures are rigorous, requiring a comprehensive submittal register and adherence to specific formats and approval processes. Design data, progress schedules, and Operation & Maintenance (O&M) data are also critical deliverables.
Submission & Evaluation
Proposals are due by 02:00 PM local time on June 29, 2026. The acquisition utilizes Lowest Priced Technically Acceptable (LPTA) Source Selection procedures. Technical evaluation will assess capability and management, and schedule and planning, with an "Acceptable" rating required for all subfactors. Price proposals will be evaluated for reasonableness, balanced pricing, and realism. A bid guarantee (minimum 20% of proposal) is required.
Important Notes
Project-specific documents, including drawings (WWYK20190023_REV02_19MAY2026.pdf), general requirements (Div 00-01), and the solicitation (FA813726R0030), are attached. Contractors experiencing difficulty accessing documents should email the Contracting Points of Contact for DoD Safe transmission. Updated general requirements include changes to terminology, submittal procedures, and form replacements.