TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117

SOL #: FA813726R0030Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Last Updated
Jun 17, 2026
3
Submission Deadline
Jun 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the renovation of men's and women's restrooms at Building 117 (B117) at Tinker Air Force Base, Oklahoma. This Design-Bid-Build contract involves complete demolition and replacement of existing plumbing fixtures, domestic piping, and sanitary sewer. This opportunity is restricted to current MAC BOA Holder General Contractors who attended the mandatory site visit on May 14, 2026. Proposals are due June 29, 2026.

Scope of Work

The project, titled "WWYK190023 – Renovate Restrooms, B117," requires the contractor to furnish all materials, labor, and services for the renovation. Key aspects include:

  • Demolition and Replacement: Complete overhaul of existing plumbing fixtures, domestic piping to isolation valves, and sanitary sewer in both restrooms.
  • Phased Construction: Men's restroom must be completed before the women's restroom, as the facility will remain occupied.
  • Temporary Facilities: The contractor must provide four portable bathrooms and four portable showers, conditioned with HVAC and serviceable bladders. These do not need to be ADA/ABA compliant.
  • Dust Control: Hard-wall dust partitions with negative air machines are required at construction area entries, with temporary dust prevention for the path to exterior exits.
  • Fixture Details: Lavatories will be solid surface sinks with countertops. One restroom will be accessible for visitors. Trap primers are required on drains (excluding showers), and water hammer arrestors do not require access panels.
  • Drawings vs. Specifications: While drawings are labeled "35% Design," no stamped design documents or design submittals are required from the contractor. Specifications take precedence over drawings in case of conflict.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to Tinker AFB MAC BOA Holders ONLY who attended the mandatory site visit on May 14, 2026.
  • Period of Performance: Work must begin within 10 calendar days after award and be completed within 625 calendar days.
  • Proposal Due Date: June 29, 2026, at 2:00 PM CTD.
  • Published Date: June 8, 2026.
  • Bid Guarantee: A bid guarantee of 20% of the bid price or $100,000, whichever is less, is required.

Evaluation Factors

Award will be made using Lowest Priced Technically Acceptable (LPTA) Source Selection procedures. Proposals will be rated "Acceptable" or "Unacceptable" for each technical subfactor, with an "Acceptable" rating required across all. Technical evaluation focuses on:

  • Capability and Management: Commitment to on-site management, subcontractor management, warranty support, and handling unforeseen site conditions.
  • Schedule and Planning: A reasonable and realistic construction schedule, including submittals, milestones, and permits. Price proposals will be evaluated for reasonableness, balanced pricing, and realism. No technical tradeoffs will be made, and no additional credit will be given for exceeding technical requirements.

Submission Requirements

Proposals must be submitted electronically in formats readable by MS Word, Excel, PowerPoint, MS-Project, or text-searchable Adobe Acrobat (PDF). No password-protected files or zip files are allowed. Each page must include the "CUI SOURCE SELECTION INFORMATION" legend. The email subject line for submissions must be "Company Name, Source Selection Information". Offerors must acknowledge all amendments.

Key Contacts

People

Points of Contact

Eric OwensPRIMARY
Stephen PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jun 17, 2026
View
Version 7Viewing
Solicitation
Posted: Jun 8, 2026
Version 6
Solicitation
Posted: Jun 8, 2026
View
Version 5
Solicitation
Posted: Jun 2, 2026
View
Version 4
Solicitation
Posted: May 28, 2026
View
Version 3
Solicitation
Posted: May 22, 2026
View
Version 2
Solicitation
Posted: May 21, 2026
View
Version 1
Solicitation
Posted: May 6, 2026
View