TINKER AFB MAC BOA WWYK250173, Replace Bowling Alley Roof, B5703

SOL #: FA813726R0029Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 10, 2026
3
Submission Deadline
Jun 15, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the replacement of the bowling alley roof at Building 5703 (B5703) at Tinker Air Force Base, Oklahoma. This opportunity is a Total Small Business Set-Aside restricted to MAC BOA holders only who attended the mandatory site visit. The estimated project value is between $1,000,000 and $5,000,000. Proposals are due by June 15, 2026.

Scope of Work

This project, identified as WWYK250173, requires the contractor to furnish all design/engineering services, materials, labor, tools, transportation, equipment, testing, and quality control for the complete roof repair and replacement of B5703. The scope includes:

  • Design-Build Services: Full design-build engineering, including structural calculations, wind uplift, thermal performance, shop drawings, and code compliance.
  • Roofing: Removal and installation of new metal roofing for Sections 2 and 3, a new EPDM roof for Section 1, and replacement of flashing, gutters, downspouts, and mechanical curbs.
  • Civil/Architectural: Demolition and new work for storm drain inlets, soil excavation, utility protection, regrading, sodding, wall finishes, insulation, exterior wall panels, and entrance components.
  • Mechanical: Removal and replacement of plumbing vent pipes, flashing, jacks, rooftop gravity ventilators, and rooftop exhaust fans/intake.
  • Site Investigation: Verification of existing conditions and identification of logistical, architectural, and structural work elements.
  • Hazardous Materials: Environmental surveys indicate potential asbestos-containing materials (ACM), heavy metals (HM), or lead-based paint (LBP) in existing materials, requiring careful handling.

Eligibility & Site Visit

This solicitation is restricted to current Tinker AFB MAC BOA holders only. Furthermore, only those MAC BOA holders who attended the mandatory Initial Site Visit on May 20, 2026, at Building 5703 are eligible to propose.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (implied Firm Fixed Price).
  • Estimated Magnitude: Between $1,000,000 and $5,000,000.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 447 calendar days.
  • Funding: Funds are not presently available; the Government's obligation is contingent upon the availability of appropriated funds.
  • Bonds: Performance and payment bonds are required.

Evaluation Criteria

Award will be based on Lowest Priced Technically Acceptable (LPTA) source selection procedures. Technical proposals will be evaluated against specific subfactors, and the award will go to the lowest evaluated priced proposal meeting acceptability standards for technical factors and responsibility.

Key Documents & Requirements

  • As-Built Drawings: Referenced for existing conditions, profiles, and manufacturer details. Required submittals include native editable AutoCAD (.dwg) and PDF formats.
  • Submittals: A comprehensive Submittal Register outlines all required documentation throughout the project lifecycle, including Health and Safety Plan, Product Data, and Shop Drawings.
  • Personnel: Key personnel (Project Manager, Design Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) must meet specific experience requirements.
  • Base Access: Personnel requiring base access must be listed on an Entry Access List (EAL) with specific personal information.
  • Wage Rates: The project is subject to Davis-Bacon Act prevailing wage rates and fringe benefits for various construction trades in Oklahoma County, Oklahoma.
  • RFI Responses: Pre-Bid RFI questions and answers have been attached, providing clarifications on demolition, wall panels, roof vents, design-build services, and hazardous materials. These responses are considered binding.

Contact Information

For inquiries, contact Mario Tedeschi at mario_cassiel.tedeschi@us.af.mil or 312-884-4701, or Tamra Torres at Tamra.torres@us.af.mil or 405-339-3513.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 10, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026
View