TINKER AFB MAC BOA WWYK250173, Replace Bowling Alley Roof, B5703

SOL #: FA813726R0029Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 10, 2026
3
Submission Deadline
Jun 15, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the replacement of the Bowling Alley Roof (B5703) at Tinker Air Force Base, Oklahoma. This opportunity is exclusively for Small Business MAC BOA Holders who attended the mandatory site visit. The estimated project value is between $1,000,000 and $5,000,000. Proposals are due June 15, 2026.

Scope of Work

This project (WWYK250173) requires comprehensive design/engineering services, materials, labor, and quality control for the repair and replacement of the roof on Building 5703. The scope includes:

  • Site investigation and field verification of existing conditions.
  • Demolition of the 1979 retrofit roof system, while retaining the original metal roof structure below certain sections.
  • Installation of new metal roofing for Sections 2 and 3, and a new EPDM roof for Section 1.
  • Replacement of flashing, gutters, downspouts, and mechanical curbs.
  • Addressing wall panel replacement, storm drain inlets, and mechanical roof components (plumbing vents, gravity ventilators, exhaust fans).
  • Full design-build engineering services are required, including structural calculations, wind uplift, thermal performance, and code compliance (UFCs, DoD Building Codes, Tinker AFB standards).
  • The facility will remain occupied during construction, requiring careful coordination.

Eligibility & Requirements

  • Restricted to Tinker AFB MAC BOA Holders ONLY.
  • Mandatory Site Visit: Only GCs who attended the site visit on May 20, 2026, are eligible to propose.
  • Key Personnel: Contractor must provide a Project Manager, Design Project Manager, Quality Control Manager, Site Safety and Health Officer, and Project Superintendent, each with specific experience requirements.
  • Base Access: Personnel requiring base access must provide specific personal information via an EAL list. AFMC Form 387 contractor badges are required.
  • Bonds: Performance and payment bonds are required.

Contract Details

  • Type: Combined Synopsis/Solicitation (implied Firm Fixed Price).
  • Set-Aside: Total Small Business Set-Aside (100%).
  • NAICS Code: 236220 (Commercial and Institutional Building Construction), Size Standard: $45,000,000.00 annual receipts.
  • Period of Performance: Completion within 447 calendar days after Notice to Proceed (NTP).
  • Evaluation: Lowest Priced Technically Acceptable (LPTA) source selection procedures. Technical proposals will be evaluated against specific subfactors.

Key Dates

  • Proposals Due: June 15, 2026, 2:00 PM local time.
  • Site Visit: May 20, 2026 (mandatory, already occurred).
  • RFIs Due: May 28, 2026 (already occurred).

Additional Notes

  • Funds are not presently available; the Government's obligation is contingent upon appropriated funds.
  • An Environmental Management survey indicates potential concerns for asbestos-containing materials (ACM), heavy metals (HM), or lead-based paint (LBP).
  • All submittals, including design submissions and as-built drawings, must be electronic, with as-builts required in both native editable AutoCAD (.dwg) and PDF formats.
  • Compliance with various FAR/DFARS clauses, EPA-designated items, and USDA-designated biobased items is required.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 10, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026
View