Update Utilities
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), specifically the DSC Contracting Services Division, has issued an unrestricted solicitation for the "Bandelier National Monument, Rehabilitate Underground Utilities" project in New Mexico. This project involves significant infrastructure upgrades with an estimated magnitude of more than $10,000,000. Proposals are due by May 27, 2026, at 1430 local time.
Scope of Work
This project requires the rehabilitation of underground utilities at Bandelier National Monument. Key aspects include:
- Culvert Repairs: Addressing a 24-inch corrugated metal pipe (CMP) under Entrance Road, including excavation and headwall repair.
- Erosion Repairs: Reconfiguring roadside drainage along Entrance Road and repairing guardrail components.
- LANL Utility Coordination: Updates to electrical drawings for CTs, PTs, metering enclosures, and primary duct bank/conduit, including demolition of H-frame pole structures and dead-end poles. Additional coordination for water, gas, and electrical utilities.
- Sewer Profile Revision: The sanitary sewer line profile for the Cottonwood Comfort Station has been revised based on updated topographic surveys.
- General Utility Rehabilitation: Covering main park water systems, Mesa Housing and FOC water mains, primary electrical distribution, and cellular network infrastructure. Optional work includes Frijoles Canyon utilities, fiber-optic cable, demolition, and campground systems.
Contract & Timeline
- Contract Type: Negotiated (RFP) Solicitation.
- Set-Aside: Unrestricted Full and Open Competition.
- Product Service Code: Y1NZ (Construction Of Other Utilities).
- Performance Period: Maximum of 910 calendar days from the Notice to Proceed.
- Funding: Award is contingent on future funding availability.
- Proposal Due: May 27, 2026, at 1430 local time.
- Published Date: April 27, 2026.
- Bonds: Performance, payment, and offer guarantee are required.
Submission & Evaluation
Proposals and questions must be submitted as detailed in Section "L" of the solicitation. Offerors must include all Federal, State, and Local taxes in their proposals and provide at least 60 calendar days for Government acceptance. A pre-proposal site visit is mentioned in Section "L". Evaluation will consider project experience, past performance, and pricing, with specific forms provided for Project Experience, Past Performance Questionnaires, and General References. Large businesses must submit a Small Business Subcontracting Plan if their total price exceeds $1,500,000.
Additional Notes
Offerors must acknowledge all solicitation amendments. Addendum No. 1 revises various sections of the specifications and drawings, including a submittal list template and a wage determination for Santa Fe County, New Mexico. A technical memorandum details design exceptions for culvert inlet repair on Route 0010 Entrance Road.