U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRID
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), San Francisco District, on behalf of the U.S. Army 63rd Readiness Division, is soliciting proposals for a MILCON Energy Resilience and Conservation Investment Program (ERCIP) Microgrid project. This project involves the installation of a comprehensive microgrid system at the 63rd Readiness Division HQ Campus in Mountain View, Santa Clara County, California. The system is designed to provide 14+ days of energy resilience for mission-critical functions, utilizing both renewable and fossil fuel sources. This is a Total Small Business Set-Aside with an estimated cost range of $10,000,000 to $25,000,000. Proposals are due electronically via PIEE by June 29, 2026, at 12:00 PM PDT.
Scope of Work
The project requires the installation of a fully functional microgrid system with full islanding capability. Key components include:
- A ground-mounted 750kW photovoltaic (PV) solar system.
- A 750kWh Battery Energy Storage System (BESS) with two 500kW inverters.
- An 800kW diesel backup generation system with a 10,000-gallon fuel storage tank.
- Low voltage switchgear, master microgrid controller, and automatic smart switches.
- The system must be installed on a Closed Restricted Network (CRN) requiring an Authority to Operate (ATO) per DODI 8510.01, with cybersecurity designed according to UFC 4-010-06.
- Work will be performed in occupied buildings. Detailed specifications cover welding (AWS, ASME, NDE) and coatings (MIL-DTL, MIL-PRF).
Contract Details
- Contract Type: Firm Fixed Price.
- Estimated Value: $10,000,000 to $25,000,000.
- Period of Performance: 732 calendar days after receipt of Notice to Proceed.
- Funding: Award is contingent upon the availability of appropriated funds (FAR Clause 52.232-18).
- NAICS Code: 237130 (Construction of Power and Communication Line and Related Structures), with a size standard of $45,000,000.
- Product Service Code (PSC): Y1MG (Construction Of Epg Facilities Solar).
Submission & Evaluation
- Proposal Due Date: June 29, 2026, at 12:00 PM PDT.
- Submission Method: Electronically through the Procurement Integrated Enterprise Environment (PIEE) website (https://piee.eb.mil).
- Offer Validity: Offers must be valid for at least 60 calendar days.
- Bid Guarantee: Required, equal to 20% of the bid price or $3,000,000, whichever is less (FAR 52.228-1).
- Evaluation Criteria: Lowest Price Technically Acceptable (LPTA) method. Proposals will be evaluated on Past Performance, Management Plan, and Schedule Narrative.
- Proposal Format: Separate Technical (max 15 pages) and Price volumes. No cross-referencing.
- Questions Deadline: Inquiries must be received no later than 14 calendar days prior to the proposal due date via email to the Contract Specialist.
Important Notes
All prospective Offerors and their subcontractors must be registered in the System for Award Management (SAM - www.SAM.gov) and PIEE to view/download solicitation information and submit offers. Registration should be completed one week prior to the anticipated solicitation release date. Offerors are advised to monitor PIEE and SAM for any amendments. Site inspection is encouraged; contact Isabel Nieman (Isabel.L.Nieman@usace.army.mil, 415-503-6773) for arrangements. The project may be delayed, cancelled, or revised.