USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Sacramento District (USACE SPK), is soliciting proposals for a Single Award Task Order Contract (SATOC) for the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This Design-Bid-Build (DBB) contract, with a total capacity of approximately $134,000,000, aims to ensure continuous mission operations during the upgrade of critical industrial infrastructure. Proposals are due May 26, 2026.
Scope of Work
This SATOC will support design-bid-build construction task orders for the renovation and modernization of plating shop facilities, specifically Buildings 505 and 507, and associated infrastructure at HAFB. Key work elements include:
- Demolition and replacement of existing plating line tanks and process equipment.
- Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines.
- Installation of chemical distribution and storage systems.
- Mechanical, electrical, and control system upgrades supporting plating operations.
- Ventilation, air quality management, and environmental control systems.
- Fire suppression and life safety system upgrades.
- Structural modifications to support new process equipment.
- Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment.
- Utility upgrades including process piping, compressed air, gases, power distribution, and controls.
- Phased construction is critical to ensure continuous mission operations during renovation, with active work requiring completion, testing, and approval before subsequent phases.
Contract Details
- Contract Type: Single Award Task Order Contract (SATOC), Firm-Fixed-Price task orders.
- Estimated Capacity: Approximately $134,000,000 over a five-year ordering period.
- Ordering Period: 1,825 calendar days (five years) from contract award.
- Task Order Value: Individual task orders are expected to range from $2,500 to $40 million, with a maximum value not to exceed approximately $50,000,000 per task order.
- Magnitude of Construction: Estimated between $100,000,000 and $250,000,000.
- CLIN Structure: Includes phased renovations (0001-0004), Chemical Addition Systems (0005), Contaminated Soil Disposal (0006), and a $40M capacity for unforeseen construction via RTOP (0007).
- Set-Aside: Unrestricted (Full and Open Competition).
Submission & Evaluation
- Submission Method: Proposals must be submitted electronically through the PIEE website.
- Procurement Strategy: Best Value Tradeoff (BVTO) procedures in accordance with FAR Part 15.
- Evaluation Factors (in order of importance):
- Past Performance (Relevancy Scale: Highly Relevant >$25M, Relevant $10M-$25M, Somewhat Relevant <$10M).
- Technical and Management Approach.
- Network Analysis Schedule (NAS).
- Small Business Participation Commitment Document.
- Price Evaluation: For completeness, reasonableness, and balance.
- Key Deadlines:
- ProjNet Questions Close: May 16, 2026
- Proposals Due: May 26, 2026
- Anticipated Award Date: August 11, 2026
Small Business Considerations
While this acquisition is full and open, the Government strongly encourages participation by small businesses as subcontractors and suppliers. Offerors are expected to demonstrate meaningful small business utilization consistent with the following goals: Small Business (SB) 23%, Small Disadvantaged Business (SDB) 5%, Women-Owned Small Business (WOSB) 5%, HUBZone 3%, and Service-Disabled Veteran-Owned Small Business (SDVOSB) 3%.
Additional Notes
A pre-proposal conference and site visit were held on May 1, 2026. All questions must be submitted through ProjNet by May 16, 2026. Performance and payment bonds will be required at the individual task order level. Liquidated damages apply for delays in construction completion for each phase.