USACE SPK Hill Air Force Base Plating Shop Renovation SATOC

SOL #: W9123826RA004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States

Place of Performance

Place of performance not available

NAICS

Industrial Building Construction (236210)

PSC

Repair Or Alteration Of Other Industrial Buildings (Z2EZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
May 26, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, Sacramento District (USACE SPK), is soliciting proposals for a Single Award Task Order Contract (SATOC) for the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This Design-Bid-Build (DBB) contract, with a total capacity of approximately $134,000,000, aims to ensure continuous mission operations during the upgrade of critical industrial infrastructure. Proposals are due May 26, 2026.

Scope of Work

This SATOC will support design-bid-build construction task orders for the renovation and modernization of plating shop facilities, specifically Buildings 505 and 507, and associated infrastructure at HAFB. Key work elements include:

  • Demolition and replacement of existing plating line tanks and process equipment.
  • Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines.
  • Installation of chemical distribution and storage systems.
  • Mechanical, electrical, and control system upgrades supporting plating operations.
  • Ventilation, air quality management, and environmental control systems.
  • Fire suppression and life safety system upgrades.
  • Structural modifications to support new process equipment.
  • Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment.
  • Utility upgrades including process piping, compressed air, gases, power distribution, and controls.
  • Phased construction is critical to ensure continuous mission operations during renovation, with active work requiring completion, testing, and approval before subsequent phases.

Contract Details

  • Contract Type: Single Award Task Order Contract (SATOC), Firm-Fixed-Price task orders.
  • Estimated Capacity: Approximately $134,000,000 over a five-year ordering period.
  • Ordering Period: 1,825 calendar days (five years) from contract award.
  • Task Order Value: Individual task orders are expected to range from $2,500 to $40 million, with a maximum value not to exceed approximately $50,000,000 per task order.
  • Magnitude of Construction: Estimated between $100,000,000 and $250,000,000.
  • CLIN Structure: Includes phased renovations (0001-0004), Chemical Addition Systems (0005), Contaminated Soil Disposal (0006), and a $40M capacity for unforeseen construction via RTOP (0007).
  • Set-Aside: Unrestricted (Full and Open Competition).

Submission & Evaluation

  • Submission Method: Proposals must be submitted electronically through the PIEE website.
  • Procurement Strategy: Best Value Tradeoff (BVTO) procedures in accordance with FAR Part 15.
  • Evaluation Factors (in order of importance):
    1. Past Performance (Relevancy Scale: Highly Relevant >$25M, Relevant $10M-$25M, Somewhat Relevant <$10M).
    2. Technical and Management Approach.
    3. Network Analysis Schedule (NAS).
    4. Small Business Participation Commitment Document.
  • Price Evaluation: For completeness, reasonableness, and balance.
  • Key Deadlines:
    • ProjNet Questions Close: May 16, 2026
    • Proposals Due: May 26, 2026
    • Anticipated Award Date: August 11, 2026

Small Business Considerations

While this acquisition is full and open, the Government strongly encourages participation by small businesses as subcontractors and suppliers. Offerors are expected to demonstrate meaningful small business utilization consistent with the following goals: Small Business (SB) 23%, Small Disadvantaged Business (SDB) 5%, Women-Owned Small Business (WOSB) 5%, HUBZone 3%, and Service-Disabled Veteran-Owned Small Business (SDVOSB) 3%.

Additional Notes

A pre-proposal conference and site visit were held on May 1, 2026. All questions must be submitted through ProjNet by May 16, 2026. Performance and payment bonds will be required at the individual task order level. Liquidated damages apply for delays in construction completion for each phase.

People

Points of Contact

Files

Files

Download
Download
View
View
View
View
Download
View
View
View
View

Versions

Version 6
Solicitation
Posted: May 20, 2026
View
Version 5Viewing
Solicitation
Posted: May 5, 2026
Version 4
Solicitation
Posted: May 4, 2026
View
Version 3
Solicitation
Posted: Apr 9, 2026
View
Version 2
Pre-Solicitation
Posted: Jan 22, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 22, 2026
View
USACE SPK Hill Air Force Base Plating Shop Renovation SATOC | GovScope