USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), is soliciting proposals for a Single Award Task Order Contract (SATOC) for the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This Design-Bid-Build (DBB) contract aims to support critical industrial operations. Proposals are due May 26, 2026.
Scope of Work
The SATOC will support construction task orders for the renovation of existing facilities (e.g., Building 505) and the new construction of an approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB). Key work includes:
- Demolition and replacement of existing plating line tanks and process equipment.
- Installation of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines.
- Installation of chemical distribution and storage systems.
- Upgrades to mechanical, electrical, control, ventilation, air quality, fire suppression, and life safety systems.
- Structural modifications and utility upgrades.
- Phased construction to ensure continuous mission operations and compliance with environmental, safety, and regulatory requirements.
Contract Details
- Contract Type: Single Award Task Order Contract (SATOC), Firm Fixed-Price task orders.
- Set-Aside: Unrestricted (Full and Open Competition).
- Estimated Capacity: Approximately $134,000,000 over a five-year ordering period (1,825 calendar days).
- Task Order Value: Individual task orders are expected to range from $2,500 to $40 million, with a maximum value not to exceed approximately $50,000,000 per task order.
- Magnitude of Construction: Estimated between $100,000,000 and $250,000,000.
- Subcontracting Goals: Small Business (SB) 23%, Small Disadvantaged Business (SDB) 5%, Women-Owned Small Business (WOSB) 5%, HUBZone 3%, Service-Disabled Veteran-Owned Small Business (SDVOSB) 3%.
Evaluation Factors
Award will be based on a Best Value Tradeoff (BVTO) process, considering:
- Past Performance (Relevancy scale: Highly Relevant >$25M, Relevant $10M-$25M).
- Technical and Management Approach.
- Network Analysis Schedule (NAS).
- Small Business Participation Commitment Document. Price will be evaluated for completeness, reasonableness, and balance.
Key Dates & Submission
- ProjNet Closes: May 16, 2026
- Proposals Due: May 26, 2026
- Anticipated Award Date: August 11, 2026
- Proposals must be submitted electronically through the PIEE website.
Additional Notes
A pre-proposal conference and site visit were held on May 1, 2026. Bonding and payment bonds will be required at the individual task order level.