USCG Base Charleston HVAC Insulation Replacement

SOL #: 70Z036-P2600-00019Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE CHARLESTON
N CHARLESTON, SC, 29405, United States

Place of Performance

North Charleston, SC

NAICS

Other Building Equipment Contractors (238290)

PSC

Air Conditioning Equipment (4120)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 17, 2026
2
Last Updated
Mar 19, 2026
3
Submission Deadline
Apr 8, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) Base Charleston is soliciting quotes for HVAC Insulation Replacement services at Building 681, Sector Prevention offices in North Charleston, SC. This is a 100% Total Small Business Set-Aside opportunity. The contract will be a Firm Fixed-Price Purchase Order, awarded based on Lowest Price Technically Acceptable (LPTA) evaluation. Quotes are due April 8, 2026, at 11:00 AM EST.

Scope of Work

The contractor will provide all labor, materials, and equipment to:

  • Seal existing HVAC ducting.
  • Remove and dispose of old HVAC insulation.
  • Install new HVAC insulation on all existing ductwork.
  • Re-install ceiling tiles and associated fixtures (e.g., smoke detectors, lights, sprinklers).
  • Minimize dust and debris, isolate work areas.
  • Provide a detailed electronic list of materials and quantities used.
  • Provide manufacturer's maintenance materials and 5% attic stock of new tiles.

Contract Details

  • Solicitation Number: 70Z036- P2600-00019
  • Contract Type: Firm Fixed-Price Purchase Order
  • Set-Aside: 100% Total Small Business (NAICS 238290, Size Standard $19.0M)
  • Place of Performance: USCG BASE Charleston, 1050 Register St, N. Charleston, SC 29405
  • Performance Period: Work to commence within 5 calendar days after award, with completion within 30 calendar days after receiving notice to proceed.

Evaluation & Award

Award will be made to a single contractor on an all-or-nothing basis, utilizing a Lowest Price Technically Acceptable (LPTA) methodology. Technical acceptability will be based on meeting all Statement of Work requirements and demonstrated ability through past performance. Only the lowest priced offer will be evaluated for technical acceptability. The Government reserves the right not to make an award.

Key Requirements & Deadlines

  • Mandatory Site Visit: Bidders are required to visit the site on March 27, 2026, between 8:00 AM and 12:00 PM EST. Contact CWO Cody Wood (Cody.A.Wood@uscg.mil) at least 24 hours prior to arrange. Failure to conduct a site visit will result in disqualification.
  • Questions Due: April 8, 2026, 11:00 AM EST, submitted in writing to Julia.S.Kline2@uscg.mil.
  • Answers Posted: No later than April 7, 2026, 11:00 AM EST.
  • Quotes Due: April 8, 2026, 11:00 AM EST, via email to Julia.S.Kline2@uscg.mil.
  • Quote Content: Detailed breakdown of labor/material costs, UEI, TIN, SF-1442, and a brief technical proposal demonstrating SOW understanding and approach.
  • Personnel Qualifications: Minimum 5 years' experience in commercial HVAC insulation installation, financially sound, references, on-site project manager.
  • Compliance: Adherence to Department of Labor wage rates (SC20260059), Buy American Act, and various FAR/HSAR clauses. Active SAM.gov UEI is mandatory.

Points of Contact

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
USCG Base Charleston HVAC Insulation Replacement | GovScope