USCG Station Brunswick Flooring Replacement

SOL #: 70Z03626Q0014Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE CHARLESTON
N CHARLESTON, SC, 29405, United States

Place of Performance

Brunswick, GA

NAICS

Flooring Contractors (238330)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

8(a) Set-Aside (FAR 19.8) (8A)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
Mar 31, 2026
3
Submission Deadline
Apr 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) is soliciting proposals for a Firm Fixed-Price contract to perform Flooring Replacement at USCG Station Brunswick, GA. This acquisition is a 100% 8(a) Set-Aside, restricted to SBA-certified 8(a) participants. The project involves removing existing flooring and installing new Luxury Vinyl Plank (LVP) in specified areas. Quotes are due by April 17, 2026, at 5:00 PM EST.

Scope of Work

The contractor will be responsible for the complete removal and disposal of existing flooring (carpet, linoleum, laminate) and the installation of new LVP flooring, including new cove base and baseboards, in designated spaces at USCG Station Brunswick. This includes sub-floor preparation, providing 10% attic stock of new flooring, and coordinating with onsite personnel to minimize disruption in the 24/7 operational facility. Furniture removal and temporary on-site storage will also be required.

Performance Requirements

New LVP flooring must be low-VOC, commercial grade, waterproof, dimensionally stable, with a wear layer of at least 30 mil and a commercial warranty of at least twenty years. The manufacturer must have at least 10 years of experience. Installation must be glued down, professional, with neat cove base, and free of gaps. All debris must be removed from government property. A 12-month warranty for parts and labor is required, in addition to manufacturer warranties.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Set-Aside: 100% 8(a) Set-Aside (FAR 19.8)
  • NAICS Code: 238330 (Flooring Contractors)
  • Size Standard: $19.0 Million
  • Period of Performance: 60 days from contract award, including 15 days for submittal and selection/approval.
  • Place of Performance: USCG Station Brunswick, 2 Conservation Way, Brunswick, GA 31520.

Evaluation & Award

Award will be made to a single contractor on an all-or-nothing basis, following a Lowest Price Technically Acceptable (LPTA) evaluation. Technical acceptability requires meeting all Statement of Work (SOW) requirements and demonstrating past performance. Only the lowest-priced offer will be evaluated for technical acceptability. The Government reserves the right to reject unreasonable quotes.

Key Dates & Actions

Important Notes

Bidders must download and review the SOW, SF-1442, Department of Labor wage rates (GA20260315), and applicable Provisions and Clauses. Quotes must include a detailed breakdown of estimated labor and material costs, Unique Entity Identifier (UEI), Tax Identification Number (TIN), and a brief technical proposal demonstrating SOW understanding. Physical flooring samples are not required with the bid; descriptions and digital color options are sufficient. Ensure your UEI is active on SAM.gov. Federal Acquisition Regulation (FAR) clauses, including Buy American requirements, and Davis-Bacon Act wage rates apply. Performance and Payment Bonds are not required.

People

Points of Contact

SKC Adam HitchcoxPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Mar 31, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
USCG Station Brunswick Flooring Replacement | GovScope