USS BOXER (LHD 4) FY27 Selected Restricted Availability (SRA) Request for Proposal (RFP)
SOL #: N0002426R4428Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVSEA HQ
WASHINGTON NAVY YARD, DC, 20376-5000, United States
Place of Performance
Place of performance not available
NAICS
Ship Building and Repairing (336611)
PSC
Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Jan 7, 2026
2
Last Updated
May 15, 2026
3
Submission Deadline
May 15, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Naval Sea Systems Command (NAVSEA) is soliciting proposals (N0002426R4428) for the FY27 Selected Restricted Availability (SRA) of the USS BOXER (LHD 4). This comprehensive effort involves significant maintenance, modernization, and repair work, requiring a highly capable contractor with substantial West Coast facilities and human resources. Proposals are due by May 15, 2026.
Scope of Work
This SRA encompasses a broad range of activities, including:
- Maintenance: Extensive hull structure repairs (sea valves, watertight doors, superstructure, various tanks), propulsion plant inspections (boilers, MRG L/O heaters, rudder seals, pumps, blowers), electric plant and distribution equipment, command and surveillance systems, auxiliary systems (insulation, compressors, piping), outfit and furnishings, and armament (RSLs, Cargo Weapons Elevators). Key tasks include ballast, fuel, CHT, and potable water tank repairs, along with propulsion shafting and rudder inspections.
- Modernization: Key modernization items include Propulsion and Auxiliary Control System (PACS), Ballast and Damage Control, Salinity Mod, NAB-Armory modernization, CANES CTU, 3MC Integration, FAS A-FRAM Boom replacement, 400 HZ SSFC Distribution, and Main Boiler Rear Refractory/Casing Upgrade.
- Facility Requirements: Bidders must possess capable pier facilities (for the applicable ship class) and sufficient human resources to coordinate and integrate multiple areas of ship maintenance, repair, and modernization. The competition area is Coast Wide – West Coast.
- Estimated Man-Days: Approximately 255,308 for maintenance and 68,649 for modernization.
Contract & Timeline
- Type: Solicitation (N0002426R4428) for a single contract award.
- Set-Aside: This procurement is not set-aside for small businesses, as market research indicated insufficient small business capability for the complexity and magnitude of the requirement.
- Proposal Due: May 15, 2026, 18:00:00Z (updated by Amendment A0006).
- Published: May 13, 2026 (latest amendment).
- Anticipated Award: Around August 2026.
- Period of Performance: February 2027 to October 2028.
Submission & Access
- Submission Method: Electronically via PIEE. Interested parties must monitor PIEE.gov and SAM.gov for the solicitation and amendments.
- Registration: Offerors must be registered in the System for Award Management (SAM) at https://www.sam.gov.
- Attachments: Not all relevant attachments are included in the public posting. Potential offerors must request access to applicable CDRLs, J- and S- attachments by emailing Contract Specialist Kevin Becker (kevin.r.becker2.civ@us.navy.mil) and Contracting Officer Paul Kang (paul.k.kang.civ@us.navy.mil). Requests must include the company's SAM Unique Entity Identifier (UEI) number. These attachments will be transmitted via DoD SAFE.
- Amendments: Amendment A0009 incorporates FAR 52.222-90. Amendment A0008 includes government responses to Bidders Questions, with specific instructions for proposal preparation related to questions 273 and 278.
Additional Notes
This is a Request for Proposal (RFP) for a complex, long-duration ship repair and modernization project. All responsible sources may submit a proposal.
People
Points of Contact
Kevin BeckerPRIMARY
Paul KangSECONDARY
Files
Versions
Version 15
Solicitation
Posted: May 15, 2026
Version 14Viewing
Solicitation
Posted: May 13, 2026
Version 13
Solicitation
Posted: May 6, 2026
Version 12
Solicitation
Posted: Apr 27, 2026
Version 11
Solicitation
Posted: Apr 14, 2026
Version 10
Solicitation
Posted: Apr 2, 2026
Version 9
Solicitation
Posted: Mar 31, 2026
Version 8
Solicitation
Posted: Mar 18, 2026
Version 7
Solicitation
Posted: Mar 16, 2026
Version 6
Solicitation
Posted: Mar 11, 2026
Version 5
Solicitation
Posted: Mar 4, 2026
Version 4
Pre-Solicitation
Posted: Feb 10, 2026
Version 3
Pre-Solicitation
Posted: Feb 5, 2026
Version 2
Sources Sought
Posted: Jan 7, 2026
Version 1
Sources Sought
Posted: Jan 7, 2026