USS BOXER (LHD 4) FY27 Selected Restricted Availability (SRA) Request for Proposal (RFP)

SOL #: N0002426R4428Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSEA HQ
WASHINGTON NAVY YARD, DC, 20376-5000, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 7, 2026
2
Last Updated
May 15, 2026
3
Submission Deadline
May 15, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the FY27 USS BOXER (LHD 4) Selected Restricted Availability (SRA). This comprehensive maintenance, modernization, and repair effort requires a highly capable contractor with substantial West Coast facilities and human resources. A single contract award is anticipated. Proposals are due May 15, 2026.

Scope of Work

The SRA for the USS BOXER (LHD 4) involves extensive work, including:

  • Maintenance: Hull structure (sea valves, watertight doors, ballast/fuel/CHT/potable water tank repairs), propulsion plant (boiler inspections, rudder seals, pumps), electric plant, auxiliary systems, outfit and furnishings, and armament. Key maintenance items include ballast tank repair, fuel oil tank repair, CHT tank repair, potable water tank repair, propulsion shafting inspection, and rudder inspection.
  • Modernization: Propulsion and Auxiliary Control System (PACS), Ballast and Damage Control, Salinity Mod, NAB-Armory modernization, CANES CTU, 3MC Integration, FAS A-FRAM Boom replacement, 400 HZ SSFC Distribution, and Main Boiler Rear Refractory/Casing Upgrade.
  • Estimated Man-Days: 255,308 for maintenance and 68,649 for modernization.
  • Facility Requirements: Capable pier (for LHD class), electrical capacity, compressed air, potable water, sea water, and sewage disposal.

Contract & Timeline

  • Type: Solicitation (RFP N0002426R4428)
  • Set-Aside: None (Full and Open Competition)
  • Proposal Due: May 15, 2026, by 18:00:00Z
  • Published: May 6, 2026 (latest amendment)
  • Anticipated Award: August 2026
  • Availability Period: February 2027 to October 2028

Submission & Contact

  • Submission Method: Electronically via PIEE.gov. Offerors must monitor PIEE.gov and SAM.gov for updates.
  • Required Registration: Offerors must be registered in the System for Award Management (SAM) at SAM.gov.
  • Accessing Attachments: Request access to CDRLs, J- and S- attachments by emailing Kevin Becker (kevin.r.becker2.civ@us.navy.mil) and Paul Kang (paul.k.kang.civ@us.navy.mil). Include your company's SAM Unique Entity Identifier (UEI) number. Attachments will be transmitted via DoD SAFE.

Additional Notes

This procurement is for a coast-wide West Coast requirement. The government's market research determined that no small business set-aside was appropriate due to the complexity, magnitude, and duration of the requirement.

People

Points of Contact

Files

Files

View
View
View
View
Download

Versions

Version 15
Solicitation
Posted: May 15, 2026
View
Version 14
Solicitation
Posted: May 13, 2026
View
Version 13Viewing
Solicitation
Posted: May 6, 2026
Version 12
Solicitation
Posted: Apr 27, 2026
View
Version 11
Solicitation
Posted: Apr 14, 2026
View
Version 10
Solicitation
Posted: Apr 2, 2026
View
Version 9
Solicitation
Posted: Mar 31, 2026
View
Version 8
Solicitation
Posted: Mar 18, 2026
View
Version 7
Solicitation
Posted: Mar 16, 2026
View
Version 6
Solicitation
Posted: Mar 11, 2026
View
Version 5
Solicitation
Posted: Mar 4, 2026
View
Version 4
Pre-Solicitation
Posted: Feb 10, 2026
View
Version 3
Pre-Solicitation
Posted: Feb 5, 2026
View
Version 2
Sources Sought
Posted: Jan 7, 2026
View
Version 1
Sources Sought
Posted: Jan 7, 2026
View