USS HIGGINS (DDG-76) FY26 6C1 SRA BUNDLE 2, Yokosuka Japan

SOL #: N6264926RA038Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

Yokosuka, JP-14, Japan

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 18, 2026
2
Last Updated
May 18, 2026
3
Submission Deadline
May 11, 2026, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVSUP Fleet Logistics Center Yokosuka (FLCY) is soliciting proposals for Surface Restricted Availability (SRA) services for the USS HIGGINS (DDG-76) during FY26 6C1 SRA Bundle 2. This is a Firm Fixed-Price (FFP) contract for comprehensive ship repair and maintenance at Yokosuka Naval Base, Japan. The solicitation is open only to firms with an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) as a Prime Contractor and authorized to operate in Japan. Proposals are due May 11, 2026, at 2:00 PM JST.

Scope of Work

The scope involves comprehensive repair and maintenance, including various Task Group Instructions (TGIs) such as:

  • Inspection, repair, and preservation of bilge areas, Gas Turbine Generator (GTG) foundations, Halon systems, potable water tanks, Vacuum Collection Holding Tank (VCHT) rooms, sewage collection tanks, and cofferdams.
  • Removal and installation of deck and bulkhead plates.
  • Repair of FWD Gas Turbine Module (GTM) and GTG Boundary Layer Infra-Red Suppression System (BLISS) Cap.
  • Preservation of Escape Trunk.
  • Inspection and replacement of Aircraft Securing Fitting and Nonskid System on Flight Deck and Forecastle.
  • Chemical cleaning of VCHT Piping System and replacement of Deck Covering. Contractor responsibilities include management, scheduling, testing, quality assurance, and technical documentation, adhering to NAVSEA Standard Items and SRF-JRMC Local Standard Items.

Contract Details & Eligibility

  • Contract Type: Firm Fixed-Price (FFP) under a Master Agreement for Repair and Alteration of Vessels (MARAV).
  • Period of Performance: June 29, 2026, to February 8, 2027.
  • Place of Performance: Government Facility (Yokosuka Naval Base, Japan).
  • Eligibility: Must possess an active U.S. Navy MSRA/ABR as a Prime Contractor and be duly authorized to operate and do business in Japan (per DFARS 252.225-7042). Non-MSRA/ABR holders can request application packages, but certification may take up to a year.
  • Set-Aside: No socio-economic set-asides will be used for this acquisition.

Submission & Evaluation

  • Proposal Due Date: May 11, 2026, at 2:00 PM Japan Standard Time (JST).
  • Work Specification Access: Attachment (I) is accessible via DoD SAFE. However, the deadline to request access (March 20, 2026) has passed, which means new offerors may be unable to obtain the necessary work package. Offerors must specify hazardous material (FAR 52.223-3) and sea transportation (DFARS 252.247-7022).
  • Evaluation: Lowest Price Technically Acceptable (LPTA), requiring an "Acceptable" rating in Technical, Past Performance, and Responsibility factors.
  • Pricing: Proposals must use Attachment II (Rev.1) Price Proposal Form, detailing labor, material, and Other Direct Costs (ODCs) in JPY. The Growth Work CLIN (0002) percentage is 9.32%.

Points of Contact

People

Points of Contact

Ai Gillard Contracting OfficerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: May 18, 2026
View
Version 12
Solicitation
Posted: May 15, 2026
View
Version 11
Solicitation
Posted: May 11, 2026
View
Version 10Viewing
Solicitation
Posted: May 7, 2026
Version 9
Solicitation
Posted: May 4, 2026
View
Version 8
Solicitation
Posted: Apr 28, 2026
View
Version 7
Solicitation
Posted: Apr 23, 2026
View
Version 6
Solicitation
Posted: Apr 14, 2026
View
Version 5
Solicitation
Posted: Apr 8, 2026
View
Version 4
Solicitation
Posted: Apr 3, 2026
View
Version 3
Solicitation
Posted: Mar 11, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 18, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 18, 2026
View