USS RAFAEL PERALTA (DDG-115) 6JI SIA FARM OUT BUNDLE 2

SOL #: N6264926RA049Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

YOKOSUKA, JP-14, Japan

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
Jun 2, 2026
3
Submission Deadline
May 29, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVSUP FLT LOG CTR YOKOSUKA is soliciting proposals for ship repair, maintenance, and overhaul services for the USS RAFAEL PERALTA (DDG-115), 6JI SIA, at Commander, Fleet Activities Yokosuka (CFAY) Naval Base, Japan. This requirement involves nine (9) Task Group Instructions (TGIs) and will result in a Firm Fixed Price Job Order under a Master Agreement for Repair and Alteration of Vessels (MARAV). Proposals are due May 29, 2026, at 10:00 AM Japan Standard Time (JST).

Scope of Work

The work encompasses comprehensive ship repair, maintenance, overhaul, preservation, and replacement tasks onboard the USS RAFAEL PERALTA (DDG-115). This includes accomplishing nine distinct Task Group Instructions (TGIs) as detailed in the provided drawings and specifications. Contractors will be responsible for necessary management, scheduling, testing, quality assurance, and technical documentation.

Contract & Timeline

  • Contract Type: Firm Fixed Price Job Order under a Master Agreement for Repair and Alteration of Vessels (MARAV).
  • Period of Performance: July 28, 2026, to September 22, 2026.
  • Place of Performance: Commander, Fleet Activities Yokosuka (CFAY) Naval Base, Japan.
  • Eligibility: Offerors must possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) as a Prime Contractor. Firms must also be authorized to operate and do business in Japan.
  • Proposal Due: May 29, 2026, at 10:00 AM Japan Standard Time (JST).
  • Published Date: May 26, 2026.

Evaluation

Proposals will be evaluated based on technical acceptability (rated "Acceptable" or "Unacceptable") and lowest total price. Price is the dominant factor, and technical tradeoffs will not be made. A Growth CLIN (0002) is included, valued at 6.65% of the total proposed cost for CLIN 0001.

Submission Requirements

Access to the work specification package (Attachment I) is exclusively through DoD SAFE. Offerors must request access by emailing the Contracting Officer, Peter Arrieta (peterjommel.s.arrieta.ln@us.navy.mil), or Contract Specialist, Irene Saito (irene.a.saito.civ@us.navy.mil). Proposals must specify hazardous materials (FAR 52.223-3, DFARS 252.223-7001) and anticipated sea transportation (DFARS 252.247-7022). Any time limits on the offer must be specified. Offerors must acknowledge all amendments in their proposal.

Amendments

Three amendments have been issued:

  • Amendment 03 (May 26, 2026): Clarified that insulation replacement (Para 2.3) is for heat treatment (Para 2.2).
  • Amendment 02 (May 14, 2026): Clarified "each space closure" in Paragraph 5.1.1.2 means a manhole.
  • Amendment 01 (May 12, 2026): Clarified Spring Clip fabrication (Para 5.1) and Table 13J-A requirements, updating Paragraph 5.5.3 and Attachment I. No changes to proposal deadlines or submission requirements were indicated by these amendments.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jun 2, 2026
View
Version 7
Solicitation
Posted: May 28, 2026
View
Version 6
Solicitation
Posted: May 27, 2026
View
Version 5
Solicitation
Posted: May 26, 2026
View
Version 4Viewing
Solicitation
Posted: May 26, 2026
Version 3
Solicitation
Posted: May 14, 2026
View
Version 2
Solicitation
Posted: May 12, 2026
View
Version 1
Solicitation
Posted: Apr 29, 2026
View