USS RAFAEL PERALTA (DDG-115) 6JI SIA FARM OUT BUNDLE 2

SOL #: N6264926RA049Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

YOKOSUKA, JP-14, Japan

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
Jun 2, 2026
3
Submission Deadline
May 29, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVSUP FLT LOG CTR YOKOSUKA, is soliciting proposals for ship repair, maintenance, and overhaul services for the USS RAFAEL PERALTA (DDG-115). This requirement, known as "6JI SIA FARM OUT BUNDLE 2," supports the US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work involves 9 Task Group Instructions (TGIs). Proposals are due May 29, 2026, at 10:00 AM Japan Standard Time (JST).

Scope of Work

This solicitation requires comprehensive ship repair, maintenance, overhaul, preservation, and replacement work onboard the USS RAFAEL PERALTA (DDG-115). The scope is defined by nine distinct Task Group Instructions (TGIs). Specific clarifications from amendments include:

  • Bilge cleaning is for NSWC Below Waterline Assessment, requiring a "fresh water wash (no soap), wipe down, fresh water rinse."
  • Pump-out work is not permitted on weekends or after sunset.
  • Insulation replacement (Paragraph 2.3) is for heat treatment (Paragraph 2.2).
  • "Space closure" in Paragraph 5.1.1.2 refers to a manhole.

Contract Details

  • Contract Type: Firm Fixed Price job order, issued under an existing Master Agreement for Repair and Alteration of Vessels (MARAV).
  • Period of Performance: July 28, 2026, to September 22, 2026. (A request to extend POP for a specific requirement was denied).
  • Place of Performance: Commander, Fleet Activities Yokosuka (CFAY) Naval Base, Japan.
  • Eligibility: Offerors must possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) as a Prime Contractor. Firms must also be authorized to operate and do business in Japan.
  • Set-Aside: None specified.

Submission & Evaluation

  • Proposal Submission Deadline: May 29, 2026, at 10:00 AM Japan Standard Time (JST).
  • Evaluation Criteria: Proposals will be evaluated for technical acceptability (rated "Acceptable" or "Unacceptable") and lowest total price. Price is the dominant factor, and technical tradeoffs will not be made.
  • Key Submission Requirements:
    • Request access to the work specification package (Attachment I) via DoD SAFE by emailing the Contracting Officer or Contract Specialist.
    • Provide a proposal breakdown form (Attachment II).
    • Specify hazardous material in accordance with FAR 52.223-3 and DFARS 252.223-7001.
    • Specify if sea transportation is anticipated (DFARS 252.247-7022).
    • Acknowledge all amendments in the proposal.

Additional Notes

  • A Government Furnished Property (GFP) list (Attachment IV) is provided and must be reviewed for planning and cost estimation.
  • A Pre-Proposal Inquiry (PPI) form (Attachment III) is available for submitting questions.
  • The solicitation includes a Growth CLIN (CLIN 0002) for anticipated growth work, valued at 6.65% of the total proposed cost for CLIN 0001.
  • Contact Information:

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jun 2, 2026
View
Version 7
Solicitation
Posted: May 28, 2026
View
Version 6Viewing
Solicitation
Posted: May 27, 2026
Version 5
Solicitation
Posted: May 26, 2026
View
Version 4
Solicitation
Posted: May 26, 2026
View
Version 3
Solicitation
Posted: May 14, 2026
View
Version 2
Solicitation
Posted: May 12, 2026
View
Version 1
Solicitation
Posted: Apr 29, 2026
View