VALVE, CONTROL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mech, is soliciting proposals for the procurement of a VALVE, CONTROL. This opportunity is a Total Small Business Set-Aside and requires compliance with various military specifications and quality assurance procedures, including mandatory review of the Individual Repair Part Ordering Data (IRPOD) and First Article Testing. Proposals are due by May 15, 2026, at 4:30 PM Local Time.
Scope of Work
This solicitation is for the acquisition of a VALVE, CONTROL. Key requirements include adherence to:
- Item Unique Identification and Valuation
- Higher-Level Contract Quality Requirements (MIL-I-45208)
- Inspection of Supplies (Fixed-Price)
- First Article Approval—Contractor Testing
- Cybersecurity Maturity Model Certification Level Requirements (NOV 2025)
- Federal Acquisition Supply Chain Security Act Orders—Prohibition
- Exclusion of Mercury in hardware or supplies.
- Specific packaging requirements per MIL-PRF-23199, MIL-DTL-24466, and MIL-STD 2073, especially for cleanliness controls.
Contract & Timeline
- Type: Solicitation (likely Firm Fixed-Price)
- Set-Aside: Total Small Business
- Proposal Due: May 15, 2026, 4:30 PM Local Time (extended by Amendment 0001)
- Published: May 4, 2026 (original opportunity publication)
- Pricing Validity: Quotes are valid for 60 days after the closing date, unless otherwise specified.
Submission & Evaluation
Offerors must include Manufacturer CAGE and Part Number within their quotes. A mandatory review of the Individual Repair Part Ordering Data (IRPOD) is required.
- First Article Testing on one unit is required, with a report submitted per DD Form 1423, and approval needed before manufacturing.
- Quality Assurance requirements are detailed in the IRPOD, requiring the contractor to maintain an acceptable inspection system.
- Waiver/Deviation requests for critical contracts must be identified in advance, accompanied by justification, and demonstrate no impact on quality, form, fit, or function.
- Required submissions include Vendor Certified Reports of Test and Inspection, Procedure Packages, and Report Packages, all per DD Form 1423 and IRPOD specifications.
Additional Information
Technical documents, including IRPOD, drawings, and specifications, may be obtained from https://logistics.unnpp.gov/ecommerce (pre-registration and password required). In case of document conflict, amendments take precedence, followed by the Schedule of Supplies, Terms and Conditions, IRPOD, STRs, drawings, and specifications.
Contact: BREANNE.R.CLIPPINGER.CIV@US.NAVY.MIL