WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), under the Department of Transportation, issued an Invitation for Bids (IFB) for Olympic National Park ERFO Repairs 2022 Road 107 (Project No. WA ERFO NPS OLYM 2022-1 (3)) in Jefferson County, Washington. This was a Total Small Business Set-Aside for construction services. Bids were opened on March 25, 2026, with one offer received from Ecogrind Site Solutions LLC.
Purpose & Scope
This project aims to perform critical repairs and bank stabilization along Road 107 (Upper Hoh Road) within Olympic National Park, addressing damage from Emergency Relief for Federally Owned Roads (ERFO) events. The scope includes:
- Bank Stabilization: Installation of riprap (Class 4 and 5), engineered log jams (ELJ) with dolosse, root wads, boulders, log-dolos bundles, and coarse woody debris.
- Fill Placement: Approximately 606 cubic yards at Mile Post (MP) 0.3 and 1,037 cubic yards at MP 0.8.
- Erosion Control: Implementation of soil erosion and sediment control measures, including temporary stream diversions.
- Revegetation: Turf establishment (seeding/mulching) and planting of government-furnished species.
- Traffic Management: Comprehensive temporary traffic control plans, including signage, flaggers, and lane closures.
- General Construction: Construction survey and staking, quality control, testing, excavation, embankment, and incidental construction. All work must adhere to the Federal Acquisition Regulation (FAR) and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, utilizing U.S. Customary units.
Contract Details
- Contract Type: Firm-fixed-price.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Engineer's Estimate: $2,306,890.00.
- Apparent Bid: $4,609,700.00 from Ecogrind Site Solutions, LLC.
- Period of Performance: Work to commence within 10 calendar days after Notice to Proceed, with completion not later than August 19, 2026.
- Place of Performance: Olympic National Park, Jefferson County, Washington (Road 107, specifically MP 0.3-0.5 and MP 0.8).
Submission & Evaluation
- Bid Opening Date: March 25, 2026, at 2:00 p.m. local time.
- One offer was received and opened. Electronic bids were not accepted; printed copies were required.
- Evaluation was based on price and other price-related factors, as is typical for IFBs.
Contact Information
For general inquiries, contact Contracts G. Office at wfl.contracts@dot.gov or 360-619-7520.