WWYK230170-Install MNS and Replace Heat Detectors B976

SOL #: FA813726R0031Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Maintenance Buildings (Z1EB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 12, 2026
3
Submission Deadline
Jun 19, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the WWYK230170 - Install Mass Notification System (MNS) and Replace Heat Detectors in Building 976 at Tinker Air Force Base, Oklahoma. This is a Firm Fixed-Price contract with an estimated value between $1,000,000 and $5,000,000. This opportunity is a Total Small Business Set-Aside and is restricted to Tinker AFB MAC BOA Holders ONLY who attended the mandatory site visit on May 18, 2026. Proposals are due June 19, 2026.

Scope of Work

The project involves furnishing design/engineering services, materials, labor, and equipment to repair and replace the fire alarm and mass notification system, along with associated fire protection equipment, in Building 976. Key tasks include:

  • Demolition and removal of existing interior fire alarm and pre-action suppression releasing systems.
  • Installation of a new Monaco MAAPX-based combination fire alarm and Mass Notification System with integral Transceiver and Antenna System.
  • Provision of flame detection in accordance with stringent practices for aircraft hangars, including triple infrared (IR) optical flame detectors.
  • Repair and modification of the existing fire sprinkler system to operate as a wet-pipe system.
  • Installation of textual display signs (LED scrolling) for

People

Points of Contact

Tamra TorresPRIMARY
Nicholas ApplebySECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Jun 12, 2026
View
Version 6
Solicitation
Posted: Jun 10, 2026
View
Version 5
Solicitation
Posted: May 27, 2026
View
Version 4
Solicitation
Posted: May 27, 2026
View
Version 3Viewing
Solicitation
Posted: May 18, 2026
Version 2
Solicitation
Posted: May 12, 2026
View
Version 1
Solicitation
Posted: May 4, 2026
View