WWYK240148-Install Electrical from FAB-T and OPCON, B820 & B829

SOL #: FA813726R0014Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 11, 2026
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Apr 28, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (AFSC PZIOC) has issued a Solicitation (WWYK240148) for the installation of electrical systems from FAB-T and OPCON at Buildings B820 & B829 at Tinker Air Force Base, Oklahoma. This requirement is set aside for Woman-Owned Small Businesses (WOSB) only. The estimated price range for this project is between $500,000 and $1,000,000. Responses are due by April 28, 2026.

Scope of Work

This project involves furnishing all materials, labor, and equipment to install electrical systems, including the removal of an existing generator and pad, replacing the pad, and installing underground conduits and components. The work requires a site investigation, procurement of logistical, architectural, and structural elements, and delivery of fully operating systems. Detailed architectural and engineering drawings (ATT10_240148-Drawings_Final.pdf) specify demolition plans, structural foundation designs, electrical site plans, generator layouts, and a one-line diagram.

Contract & Timeline

  • Contract Type: Solicitation
  • Set-Aside: Woman-Owned Small Business (WOSB) only
  • Estimated Value: $500,000 - $1,000,000
  • Published Date: April 1, 2026
  • Site Visits: Concluded on March 25, 2026, and March 31, 2026 (mandatory for responsiveness).
  • RFIs Due: April 7, 2026 COB
  • Response Due: April 28, 2026, 20:00:00Z

Key Requirements & Information

  • Mandatory Site Visits: Site visits were held on March 25 and March 31, 2026. Attendance was mandatory to be considered responsive.
  • RFI Process: All Requests for Information (RFIs) must be submitted in writing by April 7, 2026 COB. Oral explanations are not binding.
  • Personnel: Key personnel (Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) with specific qualifications are required. All personnel must have appropriate badging and access for Tinker AFB, including controlled/restricted areas.
  • Documentation: A Submittal Register (ATT9_240148_Submittal Register_Final.pdf) outlines post-award documentation requirements, including a baseline construction schedule within 10 days of Notice to Proceed.
  • Wage Determination: The Wage Determination.pdf document provides prevailing wage rates and fringe benefits for various construction trades in Oklahoma County, Oklahoma, which must be adhered to for labor cost estimation and compliance.
  • Place of Performance: S Coffeyville, OK 73145, United States (Tinker Air Force Base).

Contact Information

People

Points of Contact

Dorothy InoaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Apr 1, 2026
Version 2
Solicitation
Posted: Mar 19, 2026
View
Version 1
Solicitation
Posted: Mar 11, 2026
View
WWYK240148-Install Electrical from FAB-T and OPCON, B820 & B829 | GovScope