Y--Pojoaque Basin Regional Water System Phase II Desi

SOL #: 140R4025R0032Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 17, 2025
2
Last Updated
May 12, 2026
3
Submission Deadline
May 15, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Reclamation, Upper Colorado Regional Office is soliciting proposals for the Pojoaque Basin Regional Water System (PBRWS) Phase II Design-Build project. This opportunity seeks a Hybrid Fixed Price and Progressive Design-Build solution to expand water infrastructure in New Mexico. Proposals are due September 15, 2025.

Project Overview

This project, authorized by the Aamodt Litigation Settlement Act, aims to design and construct Phase 2 of the PBRWS, located approximately 15 miles north of Santa Fe, New Mexico. The system will deliver 4,000 acre-feet of water annually, with a peak daily demand of 6.23 million gallons per day, meeting federal safe drinking water standards for the Pueblos of San Ildefonso, Pojoaque, Nambé, Tesuque, and Santa Fe County. Phase 2 must be compatible with the ongoing Phase 1 construction.

Scope of Work

The contractor will execute a progressive design-build approach:

  • Design Phase: Utilize existing 60-100% design drawings and a WaterGEMS model, incorporating value engineering and innovative technology to achieve 90% design completion. This phase involves iterative design and cost estimation, culminating in a fixed-price proposal for construction.
  • Construction Phase: Complete 100% design and construction, including inspection, cultural monitoring, system disinfection, acceptance testing, startup, and as-built drawings. Integration of specified existing drinking water infrastructure is required.
  • Post-Construction Phase: Includes pump station testing, demonstration testing, operator training, and 6 months of technical support. Key requirements include providing facilities meeting federal clean drinking water standards, accommodating varying production quantities (170,000 GPD to 6.23 MGD), ensuring compatibility with Phase 1, implementing an effective safety program, and complying with environmental and cultural resources commitments.

Contract Details

  • Contract Type: Hybrid Fixed Price and Progressive Design-Build.
  • Estimated Budget: $180,000,000 - $300,000,000.
  • Period of Performance: 180 days for design and stakeholder facilitation, followed by 1,120 days for construction, commissioning, and performance testing (total 1,300 days).
  • Minimum Bonding Capacity: $280,000,000.
  • NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction (Size Standard: $45 million).
  • PSC Code: Y1NE - Construction Of Water Supply Facilities.

Submission & Evaluation

This is a two-phase design-build selection process:

  • Phase One (Qualifications): Offerors submit qualifications including Technical Qualifications (up to three projects per specialty, total 12, within last 10 years), Project Team Organization and Key Personnel, and Past Performance Questionnaires (PPQs). Phase One-Factor 1 (General Technical Approach) has been deleted.
  • Phase Two (Request for Proposals): The three most highly qualified firms from Phase One will be invited to submit technical and price proposals, including Design Concept, Technical Approach, and Small Business Participation. A stipend of $250,000 will be provided to unsuccessful Phase II Offerors who submit complete proposals. Evaluation will be based on a best value process, with technical factors combined being significantly more important than price.

Key Dates

  • Overall Offer Due Date: September 15, 2025.
  • Past Performance Questionnaires (PPQs) Due: May 12, 2026, at 5:00 PM Mountain Time, emailed to mary_maestas@ios.doi.gov.

Eligibility & Set-Aside

This acquisition is for Full and open competition; no set-aside. Offerors must be actively registered in SAM.gov.

Contact Information

For inquiries, contact Mary Maestas at mmaestas@usbr.gov or 505-462-3581.

People

Points of Contact

Maestas, MaryPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: May 12, 2026
View
Version 7Viewing
Solicitation
Posted: May 6, 2026
Version 6
Solicitation
Posted: Apr 28, 2026
View
Version 5
Solicitation
Posted: Apr 24, 2026
View
Version 4
Solicitation
Posted: Apr 20, 2026
View
Version 3
Solicitation
Posted: Apr 13, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 4, 2026
View
Version 1
Sources Sought
Posted: Sep 17, 2025
View
Y--Pojoaque Basin Regional Water System Phase II Desi | GovScope