Y1DZ--659-22-405 | Install Campus Generator | Salisbury VAMC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is soliciting proposals for the installation of a new Campus Generator at the W.G. (Bill) Hefner VAMC in Salisbury, NC. This project, identified as 659-22-405, aims to replace outdated backup power systems with a robust emergency generator station. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Offers are due by April 9, 2026, at 10:00 AM EST.
Scope of Work
The project involves the comprehensive design and construction of a new 1-story building (approx. 6,300 sq ft) and an adjacent open-air fuel tank yard (approx. 2,000 sq ft) to house three stand-alone medium-voltage diesel generators. Key deliverables include:
- Generator System: Installation of N+1 redundant generators providing 5.5MW capacity, complete with paralleling switchgear, load bank, high-resistance grounding, unit substations, and automatic transfer switches.
- Site Civil: Extensive site preparation, demolition (including a 6,000-gallon underground diesel tank), grading, drainage, utility connections (water, electrical), storm sewer, and landscaping.
- Structural & Architectural: Construction of a building designed for Risk Category IV (critical facility) and Seismic Design Category C, featuring high impact-resistant exterior walls, brick veneer, and blast-rated louvers. Foundations require removal and replacement of unsuitable fill.
- MEP & Fire Systems: Implementation of HVAC for generator/electrical rooms, filtered/muffled exhaust, double-walled fuel oil distribution (96 hours run-time for two generators), wet-pipe sprinkler system, domestic cold water, and fire detection/alarm systems.
- Electrical & Communication: Interconnection with existing campus electrical infrastructure, including new medium-voltage feeder duct banks, and installation of network cabling, IP POE cameras, and dual-authentication access control.
Contract Details & Requirements
- Contract Type: Solicitation (NAICS 236220, PSC Y1DZ)
- Estimated Magnitude: $10,000,000 to $20,000,000
- Period of Performance: 420 calendar days
- Warranty: 1-year on all installed items
- Compliance: Strict adherence to VA PG-18 design manuals, IBC, NFPA codes (e.g., NFPA 110 Level 1), NEC, IEEE, and the VA Physical Security and Resiliency Design Manual (PSRDM).
- Quality & Project Management: Requires a comprehensive Contractor Quality Control (CQC) plan, a Critical Path Method (CPM) project schedule with cost loading, and detailed submittal processes.
- Commissioning: Independent third-party commissioning is mandated for all systems.
- Bonds: Bid guarantee, performance, and payment bonds are required for contracts exceeding $150,000.
Submission & Deadlines
- Offers Due: April 9, 2026, 10:00 AM EST
- Virtual Bid Opening: April 9, 2026, 10:00 AM EST
- Questions/RFIs Due: March 24, 2026, 2:00 PM EST
- Pre-Bid Conference/Site Visit: Held on March 17, 2026 (roster available).
- Contact: Sean A Cosby, Contracting Officer (Sean.Cosby@va.gov).
- Eligibility: Offerors must be registered and certified as an SDVOSB in SAM.gov.