Z--NCR PRWI: C5 BATHHOUSE & VISITOR ACCESS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, National Park Service is soliciting proposals for the rehabilitation and visitor access improvements at Camp 5 Bathhouses and Visitor Access within Prince William Forest Park, Triangle, VA. This project involves significant construction work to meet accessibility standards and upgrade facilities. Proposals are due March 27, 2026, at 5:00 PM local time.
Scope of Work
This Firm Fixed Price contract encompasses comprehensive rehabilitation, renovation, and reconfiguration of the Camp 5A and Camp 5B Bathhouses, along with improvements to visitor access. Key tasks include:
- Bathhouse Renovations: Demolition and replacement of subgrade piping, plumbing fixtures, interior finishes, electrical wiring and panels, HVAC systems (heat pumps, exhaust fans, unit heaters), and hot water heaters. Reconfiguration to comply with Architectural Barriers Act Accessibility Standards (ABAAS). Exterior work includes replacing damaged wood paneling/siding and adding gutter/downspout systems. Hazardous materials handling (PCBs, mercury, asbestos, lead-based paint) is required.
- Visitor Access Improvements: Construction of accessible pedestrian paths, replacement of existing gravel parking lots with asphalt, and replacement of timber retaining walls with concrete/stone veneer.
- Site Infrastructure: Soil testing and analysis, construction of stormwater management facilities and storm sewer piping, and adding janitor closets with service sinks.
Contract Details & Requirements
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business
- NAICS Code: 236220 (Commercial and Institutional Building Construction) with a $45 Million size standard.
- Period of Performance: 10 calendar days to commence after Notice to Proceed, with completion within 160 calendar days.
- Bonds: Performance and Payment Bonds are required.
- Wage Determination: Compliance with Davis-Bacon Act prevailing wage rates (GDN VA20260162 for Prince William County, VA) is mandatory.
- Site Conditions: Utilities are not available on-site. The contractor is responsible for obtaining the Virginia DEQ stormwater permit. Camp 5 will be closed during construction, but the park remains open.
Submission & Evaluation
- Proposals Due: March 27, 2026, at 5:00 PM local time.
- Submission Method: Email to tim_wind@nps.gov.
- Format: Two volumes: Volume I (Non-Price Proposal) and Volume II (Price Proposal).
- Evaluation: Best Value Continuum Tradeoff Process, considering Project Experience, Technical Approach, Key Personnel Experience, Past Performance, and Price.
- Eligibility: Offerors must be registered and active in the System for Award Management (SAM). Firms involved in developing the design are ineligible.
- Amendments: Offerors must acknowledge receipt of all amendments. Amendment 0002 clarifies that red/yellow flexible porous pavement paths are not part of the contract and provides guidance on the Subcontracting Report Template.
Contact Information
For questions, contact Timothy Wind at Tim_Wind@nps.gov or 303-969-2070.