Z1DA--Renovate Surgical Suite Phase II

SOL #: 36C24626R0039Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
246-NETWORK CONTRACTING OFFICE 6 (36C246)
HAMPTON, VA, 23667, United States

Place of Performance

Salem, VA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Mar 26, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
May 27, 2026, 9:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 6, has issued Solicitation 36C24626R0039 for the Renovation of the Surgical Suite Phase II at the Salem VA Medical Center in Salem, VA. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves comprehensive upgrades to modernize the surgical environment. Proposals are due by Wednesday, May 27, 2026, at 5:30 PM EST.

Scope of Work

This Firm-Fixed-Price contract requires general construction, selective demolition, and extensive upgrades to mechanical, electrical, plumbing, fire protection, and fire alarm systems. The project aims to create eight upgraded operating rooms, including a hybrid OR and six general ORs, along with associated support spaces and Post-Anesthesia Care Unit (PACU) areas. Key deliverables include:

  • Structural modifications, including steel support for new HVAC and roof structure modifications.
  • Architectural renovations to expand and modernize the surgical suite.
  • HVAC system upgrades for 100% Outside Air Pandemic Mode operation, including new Rooftop AHU, chillers, air handling units, ductwork, and utility piping.
  • Plumbing modifications for domestic water, storm water, sanitary, vent systems, and medical gases.
  • Electrical system modifications and replacement of the emergency generator, including two new 8,000-gallon Highland fuel oil tanks.
  • Fire suppression and fire alarm system modifications.
  • The contractor is responsible for furnishing and installing integrated OR ceiling systems, moving and connecting a VA-provided UPS, and disposing of the old generator.
  • All work must be phased to maintain surgical operations within the active healthcare facility, ensuring at least three operating rooms remain functional at all times. Compliance with Infection Control Risk Assessment (ICRA) protocols, OSHA safety, and VA standards is mandatory.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Estimated Value: Between $20,000,000 and $50,000,000 (from presolicitation)
  • Period of Performance: 840 calendar days from issuance of Notice to Proceed.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Offerors must be SAM.gov registered and SBA certified.
  • NAICS Code: 236220 - Commercial and Institutional Building Construction (Size Standard: $45 million).

Submission & Evaluation

Proposals will be evaluated using a competitive Tradeoff source selection process, where Technical Factor and Past Performance Factor are significantly more important than Price Factor.

  • Proposals Due: Wednesday, May 27, 2026, at 5:30 PM EST.
  • Questions Due: Monday, May 18, 2026, at 5:30 PM EST.
  • Submission Method: Via email to chanel.johnson@va.gov.
  • Requirements: A Bid Guarantee (20% of bid price, not to exceed $3,000,000) is required. Payment and Performance bonds will be required after award. The page limit for Instructions to Offerors is 15 pages, and page limitation requirements have been removed from the Evaluation Criteria.

Key Clarifications

Recent amendments have provided responses to additional RFIs, clarifying details on the integrated OR ceiling system, fuel tank scope (two new 8,000-gallon tanks), lightning protection, UPS handling, and generator disposal. Bidders must incorporate these clarifications into their proposals.

People

Points of Contact

CHANEL JOHNSONCONTRACT SPECIALISTPRIMARY
Daniel SpauldingSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: May 20, 2026
View
Version 9Viewing
Solicitation
Posted: May 15, 2026
Version 8
Solicitation
Posted: May 14, 2026
View
Version 7
Solicitation
Posted: May 11, 2026
View
Version 6
Solicitation
Posted: Apr 30, 2026
View
Version 5
Solicitation
Posted: Apr 23, 2026
View
Version 4
Solicitation
Posted: Apr 14, 2026
View
Version 3
Solicitation
Posted: Apr 10, 2026
View
Version 2
Pre-Solicitation
Posted: Apr 10, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 26, 2026
View