Z2DA--657-24-110JB - FCA Replace Roofs on Buildings 1, 52, 53

SOL #: 36C25526R0041Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
255-NETWORK CONTRACT OFFICE 15 (36C255)
LEAVENWORTH, KS, 66048, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Hospitals And Infirmaries (Z2DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 19, 2025
2
Last Updated
May 11, 2026
3
Submission Deadline
Feb 9, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is soliciting proposals for a Firm-Fixed-Price construction contract to replace the roofs on Buildings 1, 52, and 53 at the St. Louis VA Medical Center, Jefferson Barracks. This project, estimated between $2M and $5M, is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due by April 23, 2026, at 3:00 PM CDT.

Scope of Work

The primary objective is to rectify deficiencies identified in Facility Condition Assessment (FCA) Reports by completely demolishing and removing existing roofing systems and installing new roofing components. This includes roof deck insulation and new membrane systems, along with supporting components.

  • Building 1: Approximately 30,000 sq ft of roofing replacement.
  • Building 52: Approximately 35,000 sq ft of roofing replacement.
  • Building 53: Approximately 24,500 sq ft of roofing replacement. The scope also covers metal fabrications, rough carpentry, thermal and moisture protection (including TPO roofing, flashing, and sealants), and electrical work, specifically lightning protection systems. All work must conform to the "release for construction" project drawings and specifications.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: 365 calendar days after Notice to Proceed (NTP).
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • Proposal Due: April 23, 2026, 3:00 PM CDT
  • Published Date: May 11, 2026
  • Site Visit: An organized site visit is scheduled for April 9, 2026, at 9:00 AM CT.
  • Questions Due: All questions are due by April 23, 2026.

Submission & Evaluation

Proposals will be evaluated using a Lowest Price Technically Acceptable (LPTA) process. Technical acceptability factors include:

  • Relevant Past Performance
  • Prime Contractor Technical Construction Experience
  • Roofing Contractor Technical Construction Experience
  • Key Personnel Qualifications
  • Prime Contractor Safety Plan Proposals must be submitted electronically to maria.hoover@va.gov and kevin.farrell@va.gov. A Bid Bond is required. Offerors must be certified in SBAVetCert and registered in SAM.gov at the time of proposal submission through award. Teaming arrangements other than VA SDVOSB Joint Ventures will not be considered.

Key Compliance Requirements

Bidders must adhere to specific requirements outlined in the provided documents:

  • Records Management Obligations: Compliance with NARA policies, Federal Records Act, FOIA, and Privacy Act for all Federal records created or handled. This includes proper preservation, security, and notification of disclosures.
  • Privacy Language: Mandatory privacy training for all personnel who may encounter VA sensitive information or Protected Health Information (PHI), emphasizing safeguards and compliance with privacy laws.
  • Specifications: Detailed technical specifications (Division 01 General Requirements, Division 07 Thermal and Moisture Protection, Division 26 Electrical) and safety protocols (Section 01 35 26) are critical for proposal preparation.

People

Points of Contact

Kevin M FarrellContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Pre-Solicitation
Posted: May 11, 2026
View
Version 4Viewing
Solicitation
Posted: May 11, 2026
Version 3
Solicitation
Posted: Mar 30, 2026
View
Version 2
Pre-Solicitation
Posted: Jan 5, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 19, 2025
View
Z2DA--657-24-110JB - FCA Replace Roofs on Buildings 1, 52, 53 | GovScope